• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 32 pages
Summary

Summary ACC300

Document preview thumbnail
Preview 4 out of 32 pages

Study notes to help you understand how to ace BCTA and BAcc in your third year.

Content preview

Accounting
Notes



·

, finance cost

Asset just takes substantial periods of time to
get ready for use/sale (takes > 12m . o




Stop capitalising when substantially




AsI likes




that support the main purpose of the asset but isn't the
primary reason for holding the asset



↳




·thewise transaction costs



(basically willy nilly staff




ognition Subsequent measurement
o : · :



transaction
↳ Probable benefits associated to the investment will flow to the ↳ fair value
fair value is the
model-between maket
price that we'd
get for
selling on asset or
transfering liability in an
orderly
economic properly entity poticipants at measurement date


ecognised
↳
in fair values the fair value
gain/loss which PIL
any difference
) in is in
↳a
be measured of the investment year a

reliably
are
cost can
property
↳ dont ↳ Cost model model
regular repairs and maintenance of I are expensed in PIL as
they increase expected benefits -
This is the same as IAS16 use all those rules (but we prefer to choose fair value


↳ replacement of of IP
increasing expected economic benefits of finance lease/
parts are IP ↳ But we
derecognise when :

disposing asset/entering a
property permanently withdrawn from use


↳ Proceeds amount Probit/Loss (in
carrying Sci
-
=




·
Deterred payment :




deterred normal credit limits then PPE is measured at cash difference between total deterred equivalent interest
↳ when
payment beyond price equivalent and the
remaining payment and cash is .




↳ So
payment cmont loan amount interest and
get
to do this number of
the
way find the deferred or ; then get your companding ;
rate then
years.

↳ interest rate and then find Pu
finally EU loan amount n
years i
= = =
; ;




non-monetary
·
Exchange of items : Cow chalt
YES
asset received be determined ? F Does the transaction have commercial substance ? "E D
Measure asset at fair value
↳ can fair value of asset
given up or
reliably
-
=
T
F
measure this asset at
carrying amont of asset given up 7

,Transferring from IP to PPE :
Transferning from PPE to IP :


You in fact if there iso n actual of use in the asset
IP to PPG but only change Difference between Carrying Ament and before
·
fair Valle
can
change the immediately change revaluation per FAS I
·
is a as



and it switches from owner-occupied to investment
property ·
Or if both are at cost model then my PPE CA is
my IP cost price

the fair value of the
IP a fair value to PPG
Inventory the cost of the
PPE/inventory will
·
transferring be remember
change in use is not
change in
accounting policy
or :
a a



date of transfer
property on


// then
↳ do fair value adjustment at date of transfer process journal to change transfers

·
If they say reference IFRS then exclude conceptual framework

The Conceptual Framework is not
any standard
Standard and
nothing conceptual framework overrides
·
a in

↳o
include if don't whet to IFRS Standards
they say .




Correcting to and make the disappear
·
journals are
adjust error

, CA of asset and provision
Ly chanage




calculate
change in interest knew interest us old interest)

calculate cont
change in


calculate change in
years




Initial estimate : R100, 000 N : 10 1 : 10
YYYYYY Year 2 : R200000
1

, N 15
:
, :#




Chan dota s (Beg)

Document information

Uploaded on
January 18, 2026
Number of pages
32
Written in
2025/2026
Type
Summary
R50,00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
4
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions