100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Technician 2026.pdf

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
21-12-2025
Written in
2025/2026

ACI Concrete Field Testing Technician










Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
December 21, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Concrete Field Testing Technician 2026\2027 correct
questions and verified answers graded a+ \\100% pass ||
latest version




When rodding the concrete sample, what is the specified number of strokes required for
each layer? -answer-25

Vibration of the concrete sample is not allowed when the slump of concrete exceeds
_____. -answer-75 mm (3 in.)

In rodding the sample, how deep should the rod penetrate each layer? -answer-Rod
bottom layer to full depth; rod second and final layer penetrating the previous layer
about 25 mm (1 in.)

After rodding each layer, what should be done to the measure before adding another
layer of concrete? -answer-Tap the sides of the measure smartly 10 to 15 times with
the mallet

When consolidating the concrete by vibration, how many times should the vibrator be
inserted into each layer? -answer-Three (3)

What tools may be used to strike off the top surface of the concrete following
consolidation of the final layer? -answer-A strike-off bar; a metal, glass, or acrylic plate

What must be done if there is a slight deficiency in the quantity of concrete in the
measure of consolidation of final layer? -answer-Add a quantity of representative
concrete before strike off

What must be done if there is an excessive amount of concrete in measure following
consolidation of the final layer? -answer-Remove a representative quantity of concrete
with the scoop or trowel before the strike off

, The volumetric method of determining air content of concrete can be used on concrete
containing what types of aggregate? -answer-All types of aggregate

STARTING SECTION C173 -answer-

What are the requirements for the tamping rod used in the test method? -answer-
Round, straight 5/8 [16 mm] +- 1/16 in. [2 mm] diameter rod at least 5 in. [300 mm]
greater in length than the depth of the bowl being used, with the tamping end rounded
to a hemispherical tip of the same diameter, made of steel, high-density polyethylene, or
other plastic of equal or greater abrasion resistance.

What are the requirements for the strike-off bar used in this test method? -answer-Flat,
straight steel bar at least 1/8 by 3/4 by 12 in. [3 by 20 by 300 mm] or a 4.4 flat, straight
high-density polyethylene bar, or other plastic of equal or greater abrasion resistance, at
least 1/4 by 3/4 by 23 in [6 by 30 by 300 mm].

What is the approximate volume of the measuring cup used to add water to the air
meter, in relation to teh volume of the air meter bowl? -answer-1.00% +- 0.04%

What type of alcohol and concentration must be used in this test method? -answer-
Isopropyl, 70% by volume (65% by weight)

A mallet weighing ____ must be used to tap the sides of the bowl after rodding each
layer. -answer-1.25 +- 0.50 lb. (600 +- 200 g)

The sample of concrete used in this test method must be obtained in accordance with
what ASTM Standard? -answer-C172

The maximum size aggregate allowed in this test method is_____. -answer-1 1/2 in.
(37.5 mm)

If the concrete sample contains aggregate larger than that allowed for this test, the
sample must be _____. -answer-Wet sieved over a 1-in. (25-mm) sieve

When filling the bowl of the air meter, the concrete must be placed in _____ layers of
equal depth. -answer-2

What is the specified number of strokes required when rodding each layer of concrete? -
answer-25

It is necessary to tap the sides of the bowl after each layer has been rodded. True or
False? -answer-True

The initial quantity of water and alcohol added to the air meter can be poured directly
into the neck of the top section of the air meter. True or False? -answer-False; the
funnel must be used
£12.59
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
winchellngatia

Get to know the seller

Seller avatar
winchellngatia The College of Richard Collyer, Horsham
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 month
Number of followers
0
Documents
117
Last sold
-
wonderful4620

Welcome to wonderful4620, your ultimate destination for high-quality, verified study materials trusted by students, educators, and professionals across the globe. We specialize in providing A+ graded exam files, practice questions, complete study guides, and certification prep tailored to a wide range of academic and professional fields. Whether you're preparing for nursing licensure (NCLEX, ATI, HESI, ANCC, AANP), healthcare certifications (ACLS, BLS, PALS, PMHNP, AGNP), standardized tests (TEAS, HESI, PAX, NLN), or university-specific exams (WGU, Portage Learning, Georgia Tech, and more), our documents are 100% correct, up-to-date for 2025/2026, and reviewed for accuracy.

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions