Comptia a+ 1101
Save
Terms in this set (311)
Step 1 of the Identify the problem
troubleshooting
process
Step 2 of the Establish a theory of probable cause
troubleshooting
process
, WGU IT Applications D317 CompTIA A+ Core 2 Exam Test Bank
Test your Theory to Determine the Cause of
Step 3 of the
the Problem
Troubleshooting
*If the theory is not confirmed, re-establish a
Process
new theory
Step 4 of the Establish a plan of action to resolve the
Troubleshooting problem and implement the solution.
Process
Step 5 of the Verify full system functionality
Troubleshooting
Process
Step 6 of the Document findings, actions, and outcomes
Troubleshooting
Process
, WGU IT Applications D317 CompTIA A+ Core 2 Exam Test Bank
An optical connector that
allows high quality audio
SPDIF Connector
to a surround sound
system
A D-shaped sub miniature
pin that goes into the back
DB 25 Connector
of a computer and has two
thumb screws on the side
Known as full speed and
runs at 12 megabits per
USB 1.1
second
, WGU IT Applications D317 CompTIA A+ Core 2 Exam Test Bank
Known as high speed and
runs at 480 megabits per
USB 2.0
second
Known as super speed
and is at least 5 gigabits
USB 3.0
per second
USB 3.1 Gen One Runs at 5 gigabits per second
USB 3.1 Gen Two Runs at 10 gigabits per second
USB 3.2 Gen 2x2 Runs at 20 gigabits per second
The most modern version
of USB and can run at 40
USB 4
gigabits per second