February 2025 DPWH Project
Engineer Exam Questions and Answers
Construction Safety and Health Program - Answer- refers to a set of detailed rules to
cover processes and practices that should
be utilized in a specific construction site including the personnel responsible and the
penalties for the violation thereof,
4-24 hours - Answer- Sawing of the joint shall commence as soon as the concrete
hardened sufficiently to permit sawing without excessive raveling.
30 minutes - Answer- Transverse construction joint shall be constructed when there is
an interruption of more than minutes in concreting operation.
1.5 m - Answer- The transverse joint shall be constructed within _____ .
7 and 28 - Answer- With in ___ calendar days the contractor has commenced work or
within ____ calendar
days after the circumstances or reasons justifying a claim for extra cost shall be
occurred.
Termination of Default - Answer- refers to the termination of the contract for (DGCS) in
infrastructure project when the contractor has incurred negative of 15% or more, or
when the contract has expired and has negative slippage of 10% or more?
Parcellary Survey - Answer- type of survey is undertaken when a proposed project land
Structural Numbers - Answer- Represents the overall structural requirement of a flexural
needed to sustain the design traffic loading?
2% - Answer- The asphalt pavement represented by the core shall be accepted if
deficiency in density is more than _____?
1.5m and 1:12 - Answer- The length of a ramp should not exceed 6.0m if the gradient is
____ longer ramps whose gradient is ____ shall be provided with landing not less than
_____
1 Layer - Answer- If the design thickness of aggregate sub base course is 200mm. In
how many layers may be the material be spread and compacted?
50 years - Answer- What is the minimum design life span of bridge years?
, Shear Failure - Answer- The transverse reinforcement in yielding, performance of
reinforced concrete columns of bridges, which mode of failure does this sieve?
Maximum Experience Flood Level (MEFL) - Answer- Highest level of elevation in
revetment
100 mm - Answer- Minimum thickness of bedding material beneath a concrete pipe
Diesel hammer - Answer- Most common pile hammer used in the Philippines
Check the actual bearing capacity - Answer- Bearing capacity test shall be conducted at
location as specified in the plans or as
designated by the project engineer to determine ______?
50% - Answer- Pile integrity test shall be conducted on at least _____
20 cm x 40 cm - Answer- Standard size of CHB
25 years - Answer- In flood design structure pccp, box culvert, roads, rcpc
1:3 - Answer- Mortar for grouted rip rap shall be consist of sand, gravel, cement and
water
Entry - Answer- Where should stop line be placed at 4 legged road
0.90 m - Answer- What is the minimum width of PWD ramp
5 - Answer- In portal cement stabilized road mixed base coarse preparation the
contractors shall not be permitted to drive heavy equipment over completed portions
prior to the end during period except pneumatic -tired equipment required for
constructing adjoining
sections.
0.30 mm - Answer- Strength for reinforcement concrete culvert pipes (RCCP) shall not
calculated in terms of KN per linear meter to produce ____ mm crack ultimate road.
Lag Time - Answer- It refers to the amount of time where by a successor activity can be
delayed with respect to the predecessor activity under a precedence diagram method
(PDM).
5.34 - Answer- What is the standard weight of 6m long, 12mm diameter RSB graded
40?
Armor the breached section with gabions mattress and spur dike to utilize gap
Engineer Exam Questions and Answers
Construction Safety and Health Program - Answer- refers to a set of detailed rules to
cover processes and practices that should
be utilized in a specific construction site including the personnel responsible and the
penalties for the violation thereof,
4-24 hours - Answer- Sawing of the joint shall commence as soon as the concrete
hardened sufficiently to permit sawing without excessive raveling.
30 minutes - Answer- Transverse construction joint shall be constructed when there is
an interruption of more than minutes in concreting operation.
1.5 m - Answer- The transverse joint shall be constructed within _____ .
7 and 28 - Answer- With in ___ calendar days the contractor has commenced work or
within ____ calendar
days after the circumstances or reasons justifying a claim for extra cost shall be
occurred.
Termination of Default - Answer- refers to the termination of the contract for (DGCS) in
infrastructure project when the contractor has incurred negative of 15% or more, or
when the contract has expired and has negative slippage of 10% or more?
Parcellary Survey - Answer- type of survey is undertaken when a proposed project land
Structural Numbers - Answer- Represents the overall structural requirement of a flexural
needed to sustain the design traffic loading?
2% - Answer- The asphalt pavement represented by the core shall be accepted if
deficiency in density is more than _____?
1.5m and 1:12 - Answer- The length of a ramp should not exceed 6.0m if the gradient is
____ longer ramps whose gradient is ____ shall be provided with landing not less than
_____
1 Layer - Answer- If the design thickness of aggregate sub base course is 200mm. In
how many layers may be the material be spread and compacted?
50 years - Answer- What is the minimum design life span of bridge years?
, Shear Failure - Answer- The transverse reinforcement in yielding, performance of
reinforced concrete columns of bridges, which mode of failure does this sieve?
Maximum Experience Flood Level (MEFL) - Answer- Highest level of elevation in
revetment
100 mm - Answer- Minimum thickness of bedding material beneath a concrete pipe
Diesel hammer - Answer- Most common pile hammer used in the Philippines
Check the actual bearing capacity - Answer- Bearing capacity test shall be conducted at
location as specified in the plans or as
designated by the project engineer to determine ______?
50% - Answer- Pile integrity test shall be conducted on at least _____
20 cm x 40 cm - Answer- Standard size of CHB
25 years - Answer- In flood design structure pccp, box culvert, roads, rcpc
1:3 - Answer- Mortar for grouted rip rap shall be consist of sand, gravel, cement and
water
Entry - Answer- Where should stop line be placed at 4 legged road
0.90 m - Answer- What is the minimum width of PWD ramp
5 - Answer- In portal cement stabilized road mixed base coarse preparation the
contractors shall not be permitted to drive heavy equipment over completed portions
prior to the end during period except pneumatic -tired equipment required for
constructing adjoining
sections.
0.30 mm - Answer- Strength for reinforcement concrete culvert pipes (RCCP) shall not
calculated in terms of KN per linear meter to produce ____ mm crack ultimate road.
Lag Time - Answer- It refers to the amount of time where by a successor activity can be
delayed with respect to the predecessor activity under a precedence diagram method
(PDM).
5.34 - Answer- What is the standard weight of 6m long, 12mm diameter RSB graded
40?
Armor the breached section with gabions mattress and spur dike to utilize gap