DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+DBIA PRACTICE TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Show more Read less
Institution
DBIA PRACTICE
Module
DBIA PRACTICE










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DBIA PRACTICE
Module
DBIA PRACTICE

Document information

Uploaded on
November 25, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

DBIA PRACTICE TEST 2025/2026
QUESTIONS WITH ANSWERS GRADED A+



1. ProjectDeliverySystem:Howteammembersareorganized,establisheswhen parties
z
k z
k z
k kz kz kz kz kz kz kz




engage, determines roles of parties, and determines sequence of design,
kz kz kz kz kz kz kz kz kz kz




procurement, and construction (db, cmar, dbb)
kz kz kz kz kz kz




2. ProcurementMethod:howteammembersareselected(QBS,bestvalue,low price, kz z
k kz kz kz kz kz kz kz kz kz




sole source)
kz kz




3. contractingapproach:howteammembersarepaid(fp,gmp,costreimburse- kz z
k kz kz kz kz kz kz kz kz




ment, target price, unit price)
kz kz kz kz kz




4. Design-Bid-Build(DBB):linear,sequentialprocess,A/Eselectedonqualifi- kz z
k kz kz kz kz kz kz




cations, GC selected on low price, design is fully completed without input from GC,
kz kz kz kz kz kz kz kz kz kz kz kz kz kz




A/E acting in owner's interests, with a historically strong bond, process is well-
kz kz kz kz kz kz kz kz kz kz kz kz kz




established and understood kz kz




5. construction manager at risk:similar org structure to DBB, construction man- ager kz kz kz kz kz kz kz kz kz kz kz




selectedbyQBSorbestvalue,contractorprovidespreconservices,negotiated gmp
kz kz kz kz kz kz kz kz kz kz kz kz




contracting approach, open book estimating process, potential to fast track project,
kz kz kz kz kz kz kz kz kz kz kz




constructioncostdeterminedbeforedesigncompleted,potentialissuesover what is
kz kz kz kz kz kz kz kz kz kz kz




reasonably inferable from gmp design documents
kz kz kz kz kz kz





g
kz g
kz

,6. Design-Build:The owner contracts with one entity (a person or firm) to provide both z
k kz kz kz kz kz kz kz kz kz kz kz kz




design and construction services, designer and contractor have a direct con- tractual
kz kz kz kz kz kz kz kz kz kz kz kz




relationship, selected by QBS or best value, wide spectrum of contracting approaches
kz kz kz kz kz kz kz kz kz kz kz kz




and organizational structures, single point responsibility, owner does not manage
kz kz kz kz kz kz kz kz kz kz




designer, owner exposure to claims is significantly reduced
kz kz kz kz kz kz kz kz




7. engineer procure construct (epc): similar to design build, in industrial and power
kz kz kz kz kz kz kz kz kz kz kz




generation sectors, systems and performance testing are central to scope, contractor
kz kz kz kz kz kz kz kz kz kz kz




willtypicallyperform engineering withits in-house staff, owner has need for single point
kz kz kz kz kz kz kz kz kz kz kz kz kz kz




responsibility, contracts include plant and process performance guarantees, contract
kz kz kz kz kz kz kz kz kz




items include performance and schedule liquidated damages and limitations of liability
kz kz kz kz kz kz kz kz kz kz kz




8. Multiple Prime Contracting: owner contracts with multiple trade contractors,
kz kz kz kz kz kz kz kz




attributesaretypicallysimilartodbb,owner'sabilitytoscheduleandcoordinatethe work
kz kz kz kz kz kz kz kz kz kz kz kz kz kz




9. Integrated Project Delivery (IPD): multi-party agreement - all parties equal, QBS z
k z
k z
k kz kz kz kz kz kz kz




procurementandtargetpricingcontractapproach,privatesectoruse(limitedatthis time),
kz kz kz kz kz kz kz kz kz kz kz kz kz




key: owner's ability to accept risk
kz kz kz kz kz kz




10. public-private partnership (p3): Instead of government building and main- kz kz kz kz kz kz kz kz




taining major infrastructure (such as highway, water treatment plant), build and
kz kz kz kz kz kz kz kz kz kz kz




maintenanceisoutsourcedtoaprivatecompany.Opposedbypublicsectorunions. this is
kz kz kz kz kz kz kz kz kz kz kz kz kz kz




not considered a delivery system but its underlying approaches are delivery systems
kz kz kz kz kz kz kz kz kz kz kz kz




and typically use DB.multiple procurement and contracting approaches
kz kz kz kz kz kz kz kz kz




g
kz g
kz

, 11. shift left: intense efforts to establish scope early in the process; drives early team
kz g kz g kz g kz g kz g g
kz kz g kz g g
kz kz g g
kz kz g g
kz




formation to include key trade subcontractors;can enable big decisions to be made
kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz kz g g
kz g
kz kz g kz g




early, affect project outcomes at lowest cost, establish a need for co-location and
g
kz g
kz kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz kz g kz g




collaboration, and compress time during concurrent design and construction
kz g kz g kz g kz g g
kz kz g kz g kz g g
kz




12. traditionaldesignbuild:typicallytwo-phasebestvalueprocurementwithlump g
z
k g
z
k g
z
k g
kz g
kz g
kz g
kz g
kz g
kz




sum contract; owner defines project requirements and scope of prescriptive work;
kz g kz g g
kz g
kz kz g kzg kz g g
kz kz g kz g kz g




use of performance-based technical requirements with limited prescriptive specifi-
kz g g
kz g
kz kz g kz g kz g kz g g
kz g
kz




cations
kz g




13. progressive design build:design and price are progressively developed after the g
kz g
kz g
z
k g
kz g
kz g
kz g
kz g
kz g
kz kz g




design-builder is under contract;final project cost and schedule commitment is not
kz g g
kz g
kz g
kz g
kz kz g g
kz g
kz g
kz g
kz g
kz kz g




established as part of the selection process; two phases: preliminary services and
kz g kz g kz g kz g kz g kz g kz g g
kz kz g g
kz kz g g
kz




final design and construction services
kz g kz g kz g g
kz kz g




14. criteria documents: describe the end result kz g g
z
k kz g kz g kz g




15. bridging documents:prescribes how to achieve the end result kz g g
z
k kz g kz g g
kz g
kz g
kz kz g




16. design bid build paradigm: prior to bidding, owner undertakes a process to kz g kz g kz g kz g kz g kz g kz g kz g kz g g
kz g
kz




design the project and all of its details to 100% complete plans and specs. the owner is
kz g g
kz g
kz g
kz kz g kz g kz g kz g kzg kz g kz g kz g kz g kz g g
kz g
kz g
kz




therefore responsible for success or failure of details of the design, and warrantsthe
kz g kz g kz g kz g kz g kz g g
kz kz g g
kz kz g g
kz kz g g
kz g
kz




sufficiencyofdesigntothecontractor.theowneristhereforeliabletothe contractorforany
g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz




gapsbetweenplansandspecificationsandowner'srequirements for project
g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz kz g g
kz




performance
kz g




17. design details responsibility: the owner should define its performance re- kz g kz g kz g g
kz kz g kz g kz g g
kz kz g




quirements and award the contract on the basis of preliminary design;this makes the
kz g kz g kz g kz g kz g kz g kz g g
kz kz g kz g g
kz g
kz kz g kz g




design-builder responsible for completing the design in accordance with the owner's
kz g kz g g
kz kz g kz g kz g g
kz g
kz kz g g
kz kz g




performance requirements.that also causes the design-builder to warrant the
g
kz kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz




sufficiency of the design to meet the owner's criteria and the sufficiency of the design
kz g g
kz g
kz kz g kz g kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz kz g kz g




to subcontractors/suppliers that have no design responsibility
kz g g
kz g
kz kz g kz g kz g g
kz




18. uniformat: subdivides project by functional elements, focuses on systems and g
z
k g
kz kz g kz g kz g g
kz g
kz g
kz kz g




assemblies, useful for preliminary information and early design phases, aligns with
kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz g
kz kz g




BIM models and conceptual estimating
kz g kz g kz g kz g kz g




19. masterformat: subdividesworkbyresults/trades,focuseson buildingmaterials, kz g g
kz g
kz g
kz g
kz g
kz g
kz g
kz




products, and activities, useful for detailed information during final design and
kz g kz g kz g g
kz g
kz kz g kz g kz g kz g kz g kz g




construction phases, and aligns with detailed estimating
kz g kz g kz g g
kz kz g kz g kz g




g
kz g
kz
£11.57
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Wisdomstudys

Get to know the seller

Seller avatar
Wisdomstudys Howard Community College
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
1 month
Number of followers
0
Documents
191
Last sold
-
Wisdomstudys

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions