100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CON 237 SIMPLIFIED ACQUISITION PROCEDURES PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+<RECENT VERSION>

Rating
-
Sold
-
Pages
68
Grade
A+
Uploaded on
15-11-2025
Written in
2025/2026

CON 237 SIMPLIFIED ACQUISITION PROCEDURES PRACTICE EXAM QUESTIONS WITH CORRECT DETAILED ANSWERS | ALREADY GRADED A+&lt;RECENT VERSION&gt; 1) You have a request to purchase 1,500 commercially available sheds, one for each family housing unit. Each shed will cost $1,500 (total of $2.25 million). - ANSWER ? Choose from the remaining answers below: -Simplified acquisition procedures can be used ONLY if the contracting officer requests a request for proposals (RFP). -Simplified acquisition procedures can be used. 2) What is the preferred method of solicitation for requirements over $25,000? - ANSWER ? I answered Written and it was wrong. 3) You have a requirement to buy janitorial services for your facility. There has been a history of performance and customer service problems with the present and past contractors. Your evaluation criteria for the follow-on solicitation should contain a factor for: - ANSWER Past performance 4) The public works department at your Federal facility needs to buy repair parts for a water fountain in the building. The parts will cost about $100 and can be bought at Nuts-n-Bolts Hardware. Which method of purchase is preferred? - ANSWER The Governmentwide commercial purchase card 5) A contract option may be exercised: - ANSWER ? This answer is wrong Only if the contractor agrees. 6) In acquisitions for commercial items, the terms of an express warranty should be: - ANSWER Consistent with customary commercial practice 7) Which of the following are acceptable market research techniques? - ANSWER All techniques listed are acceptable. 8) Which method of purchase is the most appropriate for requirements exceeding the the micro-purchase threshold? - ANSWER Purchase Order 9) A commercial item is a supply or service that: - ANSWER -Requires extensive modifications unique to the Government. -Is a previously developed item used exclusively for governmental purposes. -Is sold or offered for sale to the general public.* -Is not available to the general public. 10) The required sources of supplies and services can be found in: - ANSWER FAR Part 8 11) A synopsis in the GPE is generally required for: - ANSWER Proposed contract actions exceeding $25,000 12) You have a one-time requirement for construction of a sidewalk between two buildings. The estimated cost is $10,000. What is the preferred method of purchase? - ANSWER Purchase order 13) Steve wants to buy eight five-shelf bookcases for his staff's new office space. The staff will be moving to their new location in 3 months. His existing office space will be occupied by another office and the existing bookcases will remain there. Market research has indicated that: - Federal Prison Industries has a delivery date of 6 months after the receipt of the order. They have a five-shelf bookcase for $139. - NIB/NISH (Committee for Purchase From People Who Are Blind or Severely Disabled) does not manufacture bookcases. - Scissors and Tape, Inc., a commercial source, can deliver 2 months after the receipt of order. They have a five-shelf bookcase for $255. - Furniture U.S.A., also a commercial source, can deliver 3 days after the receipt of order. They have a five-shelf bookcase for $145. What action should you take? - ANSWER I answered delay move, but it was marked incorrect 14) A synopsis and a solicitation may be combined when acquiring commercial items. - ANSWER True 15) You have a requirement to purchase equipment that was previously developed at Government expense and sold exclusively to the military. This type of item is: - ANSWER A non-developmental item 16) You have a new requirement for something you have bought before using SAP. The action does not need to be synopsized and there are currently no standing price quotes. You should request quotations or offers from at least three other sources; if practicable, from two sources not included in the previous solicitation. - ANSWER True 17) Micro-purchases are: - ANSWER Unrestricted 18) Each contracting office maintaining additional vendor files should identify the status of each source (when the status is made known to the contracting office) in the following categories except for: - ANSWER Educational institutions 19) When making a commercial purchase, you may conduct an in-process inspection: - ANSWER Only if consistent with customary commercial practice. 20) A training facility needs to purchase 50 binders from a local office supply store. The price for the binders is $20 each. What is the preferred method of purchase? - ANSWER The Governmentwide commercial purchase card 21) An offeror's past performance as an evaluation factor consists of: - ANSWER Their record of conforming to past contract requirements 22) You have a requirement for eight units of a non-commercial item. Each item is estimated to cost $35,000. - ANSWER Simplified acquisition procedures cannot be used. 23) The installation engineers have a recurring need for 2x4s, plywood, sheetrock, and an assortment of screws and nails over the next 6 months. The estimated amount of each purchase will range from $300 to $5,000. What would be the most effective way of meeting this recurring requirement? - ANSWER Establish blanket purchase agreements with several local suppliers 24) You may cancel a unilateral purchase order if: - ANSWER The contractor accepts the cancellation and does not claim costs were incurred from beginning performance 25) You should use SAP when: - ANSWER The estimated value of the requirement is equal to or less than the SAT. 26) The priority for required sources of supplies is: inventories of the requiring agency, excess from other agencies, - ANSWER Federal Prison Industries, Committee for Purchase from People Who are Blind or Severely Disabled, governmental wholesale supply sources, commercial sources. 27) Evaluation factors such as price and past performance are: - ANSWER Used to evaluate responses to a solicitation 28) Why are oral solicitations not normally used for requirements exceeding $25,000? - ANSWER ?This answer was wrong Requirements over $25,000 are always too complex for oral solicitation 29) Which type of item is LEAST preferred for satisfying Government requirements? - ANSWER Developmental item 30) Market research is performed: - ANSWER To determine if commercial or non-developmental items will satisfy the need 31) You have a requirement to purchase observation-surveillance drones for Navy Seal Teams. Market research reveals no commercially developed items that will meet your specification requirements. However, there is a similar drone that was developed exclusively for the Army that will satisfy the requirements for the Army that will satisfy the requirement. This type of item is a:ent. This type of item is a: - ANSWER Non-Developmental 32) Which of the following should NOT affect how market research is performed? - ANSWER The number of people in the contracting office 33) The required sources of supplies and services can be found in - ANSWER FAR Part 8 34) You need a trophy engraved for the installation commander to present to the winner of the Annual Co-ed Softball Tournament. You estimate the cost to be $150. The preferred method of purchase is - ANSWER The Governmentwide commercial purchase card 35) What is a punch list? - ANSWER A punch list summarizes corrections that a contractor must make prior to the client accepting the work as complete. 36) What example illustrates the use of an RFI? - ANSWER An example is when an ICT installer finds fire barriers in walls that prevent the installation of cables as indicated in the drawings. 37) What is an RFI in the context of construction projects? - ANSWER A Request for Information asking for direction from the client's representative or design professional. 38) What might happen if a surface raceway is installed without written approval? - ANSWER The contractor may not receive compensation for extra work and materials, and the client may direct the removal and redoing of the work. 39) What should an RFI clearly indicate? - ANSWER Specific work within the project scope that requires clarification, additional information, or approval of a modification/substitution. 40) What references should be included in an RFI narrative? - ANSWER Applicable drawing, specification section, bill of materials reference, or other contract document references. 41) Who is responsible for reviewing the RFI narrative upon receipt? - ANSWER The telecommunications Project Manager (PM). 42) What types of issues are typically the client's responsibility in RFI responses? - ANSWER Purely contractual or client administrative and operational issues. 43) Who typically generates the technical elements of an RFI response? - ANSWER The ICT designer or design team responsible for the original design or construction phase technical support. 44) What additional coordination may be required when preparing an RFI response? - ANSWER Coordination with other design disciplines such as architectural, mechanical, electrical, and civil/structural. 45) What may be necessary if the RFI narrative requires revisions to the contract documents? - ANSWER A formal modification to the Statement of Work (SoW) may need to be issued to the contractor/installer. 46) What must the telecommunications PM determine if a contract modification is needed? - ANSWER If a cost or schedule impact to the project will result. 47) What happens after approval is granted for additional work related to an RFI? - ANSWER The contractor/installer typically prepares and submits a cost proposal for review and negotiation. 48) What is the typical response time stipulated in contracts for an RFI? - ANSWER A specific time interval, often seven days. 49) What should the telecommunications PM do if additional time is needed to respond to an RFI? - ANSWER Notify the contractor/installer or Construction Manager (CM) that additional time is required. 50) What are submittals in the construction industry? - ANSWER Forms of communication between the contractor/installer and client defining how a job will be undertaken. 51) What are action submittals? - ANSWER Part of the QA process requiring review by the design professional to ensure compliance with contract documents. 52) What can happen if contractors/installers do not allow enough time for submittal approval? - ANSWER They may be required to remove non-conforming work installed prior to approval. 53) What are the two main components of submittals in construction? - ANSWER Shop drawings and manufacturer's product data sheets or certificates.

Show more Read less
Institution
CON 237
Module
CON 237











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CON 237
Module
CON 237

Document information

Uploaded on
November 15, 2025
Number of pages
68
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CON 237 SIMPLIFIED
ACQUISITION PROCEDURES
PRACTICE EXAM QUESTIONS
WITH CORRECT DETAILED
ANSWERS | ALREADY GRADED
A+<RECENT VERSION>


1) You have a request to purchase 1,500 commercially available sheds, one for each family
housing unit. Each shed will cost $1,500 (total of $2.25 million). - ANSWER ? Choose from
the remaining answers below:
-Simplified acquisition procedures can be used ONLY if the contracting officer requests a
request for proposals (RFP).
-Simplified acquisition procedures can be used.



2) What is the preferred method of solicitation for requirements over $25,000? - ANSWER ?
I answered Written and it was wrong.



3) You have a requirement to buy janitorial services for your facility. There has been a history of
performance and customer service problems with the present and past contractors. Your
evaluation criteria for the follow-on solicitation should contain a factor for: - ANSWER
Past performance



4) The public works department at your Federal facility needs to buy repair parts for a water
fountain in the building. The parts will cost about $100 and can be bought at Nuts-n-Bolts
Hardware. Which method of purchase is preferred? - ANSWER The Governmentwide
commercial purchase card



5) A contract option may be exercised: - ANSWER ? This answer is wrong Only if the
contractor agrees.

,6) In acquisitions for commercial items, the terms of an express warranty should be: -
ANSWER Consistent with customary commercial practice



7) Which of the following are acceptable market research techniques? - ANSWER All
techniques listed are acceptable.



8) Which method of purchase is the most appropriate for requirements exceeding the the
micro-purchase threshold? - ANSWER Purchase Order



9) A commercial item is a supply or service that: - ANSWER -Requires extensive
modifications unique to the Government.
-Is a previously developed item used exclusively for governmental purposes.
-Is sold or offered for sale to the general public.*
-Is not available to the general public.



10) The required sources of supplies and services can be found in: - ANSWER FAR Part 8



11) A synopsis in the GPE is generally required for: - ANSWER Proposed contract actions
exceeding $25,000



12) You have a one-time requirement for construction of a sidewalk between two buildings. The
estimated cost is $10,000. What is the preferred method of purchase? - ANSWER
Purchase order



13) Steve wants to buy eight five-shelf bookcases for his staff's new office space. The staff will be
moving to their new location in 3 months. His existing office space will be occupied by
another office and the existing bookcases will remain there. Market research has indicated
that: - Federal Prison Industries has a delivery date of 6 months after the receipt of the order.
They have a five-shelf bookcase for $139. - NIB/NISH (Committee for Purchase From People
Who Are Blind or Severely Disabled) does not manufacture bookcases. - Scissors and Tape,
Inc., a commercial source, can deliver 2 months after the receipt of order. They have a five-
shelf bookcase for $255. - Furniture U.S.A., also a commercial source, can deliver 3 days after
the receipt of order. They have a five-shelf bookcase for $145. What action should you take?
- ANSWER I answered delay move, but it was marked incorrect



14) A synopsis and a solicitation may be combined when acquiring commercial items. -
ANSWER True

,15) You have a requirement to purchase equipment that was previously developed at
Government expense and sold exclusively to the military. This type of item is: - ANSWER
A non-developmental item



16) You have a new requirement for something you have bought before using SAP. The action
does not need to be synopsized and there are currently no standing price quotes. You should
request quotations or offers from at least three other sources; if practicable, from two
sources not included in the previous solicitation. - ANSWER True



17) Micro-purchases are: - ANSWER Unrestricted



18) Each contracting office maintaining additional vendor files should identify the status of each
source (when the status is made known to the contracting office) in the following categories
except for: - ANSWER Educational institutions



19) When making a commercial purchase, you may conduct an in-process inspection: -
ANSWER Only if consistent with customary commercial practice.



20) A training facility needs to purchase 50 binders from a local office supply store. The price for
the binders is $20 each. What is the preferred method of purchase? - ANSWER The
Governmentwide commercial purchase card



21) An offeror's past performance as an evaluation factor consists of: - ANSWER Their record
of conforming to past contract requirements



22) You have a requirement for eight units of a non-commercial item. Each item is estimated to
cost $35,000. - ANSWER Simplified acquisition procedures cannot be used.



23) The installation engineers have a recurring need for 2x4s, plywood, sheetrock, and an
assortment of screws and nails over the next 6 months. The estimated amount of each
purchase will range from $300 to $5,000. What would be the most effective way of meeting
this recurring requirement? - ANSWER Establish blanket purchase agreements with
several local suppliers

, 24) You may cancel a unilateral purchase order if: - ANSWER The contractor accepts the
cancellation and does not claim costs were incurred from beginning performance



25) You should use SAP when: - ANSWER The estimated value of the requirement is equal to
or less than the SAT.



26) The priority for required sources of supplies is: inventories of the requiring agency, excess
from other agencies, - ANSWER Federal Prison Industries, Committee for Purchase from
People Who are Blind or Severely Disabled, governmental wholesale supply sources,
commercial sources.



27) Evaluation factors such as price and past performance are: - ANSWER Used to evaluate
responses to a solicitation



28) Why are oral solicitations not normally used for requirements exceeding $25,000? -
ANSWER ? This answer was wrong
Requirements over $25,000 are always too complex for oral solicitation



29) Which type of item is LEAST preferred for satisfying Government requirements? -
ANSWER Developmental item



30) Market research is performed: - ANSWER To determine if commercial or non-
developmental items will satisfy the need



31) You have a requirement to purchase observation-surveillance drones for Navy Seal Teams.
Market research reveals no commercially developed items that will meet your specification
requirements. However, there is a similar drone that was developed exclusively for the Army
that will satisfy the requirements for the Army that will satisfy the requirement. This type of
item is a:ent. This type of item is a: - ANSWER Non-Developmental



32) Which of the following should NOT affect how market research is performed? - ANSWER
The number of people in the contracting office



33) The required sources of supplies and services can be found in - ANSWER FAR Part 8
£10.00
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
jervismuthami
4.0
(1)

Get to know the seller

Seller avatar
jervismuthami Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
7
Member since
6 months
Number of followers
0
Documents
560
Last sold
5 days ago

4.0

1 reviews

5
0
4
1
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions