100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC RC Exam Study Guide (2025/2026 Latest Update) | Verified Questions & Key Concepts

Rating
-
Sold
-
Pages
20
Grade
A+
Uploaded on
07-11-2025
Written in
2025/2026

NERC RC exam study guide 2025/2026, verified NERC RC questions and answers, NERC reliability coordinator exam prep, NERC RC practice test PDF, updated NERC RC exam solutions, NERC RC key concepts review, NERC exam study material 2025/2026, NERC RC exam prep guide, NERC RC regulatory exam, NERC RC test questions

Show more Read less
Institution
NCSO - NERC Certified System Operator
Module
NCSO - NERC Certified System Operator










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCSO - NERC Certified System Operator
Module
NCSO - NERC Certified System Operator

Document information

Uploaded on
November 7, 2025
Number of pages
20
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC RC Exam Questions & Answer key
(NIa - NIs) - 10β(fa - fs) - Ime
Calculated every 6 seconds
What is ACE? Uses Tie line Frequency Bias


Largest offset to ACE
What is Tie line deviation?


What is NIA? Net Interchange Actual (sum of all tie-line values)

Net Interchange Scheduled (sum of all interchange
What is NIS? schedules)


What is the multiplier for 10
frequency bias?

Frequency bias - represented as negative number in
ACE calculation - reflects area natural response to
frequency changes (Inertia, Governor, Load) - atleast
1% of annual peak load for areas with native load -
What is β? 1% of peak generation output for area with no load




What is FA? Frequency Actual

Frequency Schedule - normally 60.00 HZ except for
What is FS? time corrections - +/- .02 Hz

Meter error
fudge factor
What is IME? used for inadvertent bilateral payback
Negligible


Contact RC
What should be done if
unable to calculate ACE
for 30 minutes?

Annually
How often should time
error and frequency
devices be
checked/calibrated?


Negative Ace The BA is Undergenerating

Positve ACE The BA is Overgenerating

, NERC RC Exam Questions & Answer key
Frequency and ACE increase.
What happens during
Internal Loss of Load?

Frequency increases, no change in ACE.
What happens during
External Loss of Load?

Monthly average >= 1% of estimated yearly peak
What is the Frequency
Bias Setting? demand per 0.1 Hz

By January 1 of each year
When should the
Balancing Authority
recalculate its Frequency
Bias Setting?

Frequency and ACE drop, tie-line flows increase into
What happens when there the system
is internal generation
loss?

Frequency drops, no change in ACE, net tie-line flows
What happens when there increase out of the system
is external generation
loss?

ACE will be positive causing the AGC to lower
What happens when generation
Frequency bias setting is
lower than frequency
response?

1% - 2% change in load
What is the percentage
change in load required
for a 1% change in
frequency?

Load will reduce by 3%
What is the load reduction
when Transmission
Customer Voltage is
reduced by 5%?

, NERC RC Exam Questions & Answer key
ACE will be a negative value and AGC will increase
generation

What happens to ACE and
AGC when the frequency
bias setting is set to a less
negative value than the
frequency response of a
Balancing Authority and a
frequency increase is
caused by a sudden loss
of load in an external
balancing area?




ACE will be a positive value and AGC will lower
generation
What happens to ACE and
AGC when the frequency
bias setting is less
negative than the
frequency response of a
Balancing Authority and a
frequency decline is
caused by a sudden loss
of generation in an
external balancing area?



What is the normal 60.00 Hz
schedule frequency?

59.98 Hz
What is the frequency
correction for fast clock
schedule?

60.02 Hz
What is the frequency
corrections for a slow
clock schedule?


When does frequency Generation increases or load decreases
increase?

Generation decreases or load increases
When does frequency
decrease?

Can only be RC
Who is the Time Monitor? one per Interconnection
£12.74
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ScholarsEdge University of the Witwatersrand
Follow You need to be logged in order to follow users or courses
Sold
4942
Member since
1 year
Number of followers
1
Documents
862
Last sold
6 hours ago

4.5

124 reviews

5
97
4
9
3
6
2
4
1
8

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions