100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

BICSI RTPM COMPREHENSIVE EXAM QUESTIONS AND ANSWERS GRADED A+

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
30-10-2025
Written in
2025/2026

BICSI RTPM COMPREHENSIVE EXAM QUESTIONS AND ANSWERS GRADED A+

Institution
BICSI RTPM
Module
BICSI RTPM










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
BICSI RTPM
Module
BICSI RTPM

Document information

Uploaded on
October 30, 2025
Number of pages
18
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

BICSI RTPM COMPREHENSIVE EXAM QUESTIONS AND
ANSWERS GRADED A+
✔✔Completing a SoW Includes - ✔✔Basic Planning
Outlining the SoW Process
Organizing the Project Team
Writing and Reviewing

✔✔Basic Planning of the SoW - ✔✔Answer the "why" and "what"

✔✔Outlining the SoW - ✔✔Outline the entire SoW; Develop outline to:
*Allow full attention to technical
*Aid achieving continuity
*Help guard against ommission
*Eliminate Redundant materials and work

✔✔What is the PM's main objective in developing a SoW - ✔✔Developing a SoW that
is:
Logical and Readable
Emphasizes most important elements
Conveys exactly what is required

✔✔If the SoW does not provide enough detail the PM should - ✔✔Submit an RFI

✔✔Are periodic progress reports considered deliverables? - ✔✔NO

✔✔SoW should specify - ✔✔The number of copies of reports and the person they
should be delivered
Any physical arrangements necessary to ensure the owner's capability to examine end
product

✔✔Developing a Safety Plan - ✔✔Each contractor should have an occupational safety
plan.

✔✔On a project where the PM is issuing only design documents safety can be -
✔✔Excluded

✔✔The purpose of Risk Management - ✔✔Determine potential risks
Identify characteristics that may have an impact

✔✔Risk - ✔✔Events or circumstance that affect plan/ scope of the project

✔✔Liability - ✔✔Events or circumstances that affect the succes of the project

,✔✔Risks can become liabilities if - ✔✔They are not effectively managed

✔✔Components of Risk Planning - ✔✔Probability and Impact

✔✔Risk Assessment - ✔✔Process of identifying and classifying risks to mitigate

✔✔How do you assess a risk - ✔✔Analysis: Probability/ Impact
Identify: What, when, how can go wrong
Mitigation :Tolerance/ Contingeny

✔✔Systematically identify risks by - ✔✔Lessons Learned
Previous data
Brainstorming / SWOT chart
Cause and Effect Diagram

✔✔Risk Identification Process - ✔✔Should be done with as many key individuals as
possible

✔✔Risk information is derived from - ✔✔Analysis of high level deliverables
Analysis of WBS and Network Diagram
Analysis of Change Request
Project Team Input
Stakeholders Input

✔✔Risk Triggers - ✔✔Events that warn of occurance of risks
These are determined during risk identification

✔✔Risk Analysis Methods - ✔✔Qualitative and Quantitative

✔✔Qualitative Risk Analysis - ✔✔Qualifies the expected impact of cost, time, quality
(Hi, Mid, Low)

✔✔Quantitative Risk Analysis - ✔✔measuring the probability and consequences of risks
as well as estimating their implications for the project objectives. Rank and multiply

✔✔Risk Severity Grid - ✔✔Captures Quantitative analysis, (time, cost, quality, risk
proximity)

✔✔Risk Planning Mitigation Techniques - ✔✔Avoidance
Sharing
Transference
Moderation
Acceptance

, ✔✔Stakeholder MGMT - ✔✔Each Stakeholder must be analyzed: how they affect/
affected by the project.
Stakeholders are given a rank based on their authority/ interest level

✔✔Developing an Organizational Breakdown Structure (OBS) - ✔✔Identify people and
organizations needed to complete the project
Shows responsibility for other team members, let's everyone know their role and
includes phone#, email, clients team

✔✔Work Breakdown Structure - ✔✔Must cover projects end product and:
Planning the project
Implementing the project
Closing out the project
Diagrammed as tree or outline structure
(Should be very specific)

✔✔Developing a schedule using PERT - ✔✔Network diagrams to identify predecessor
and successor relationships

✔✔What are the dependencies of PERT - ✔✔Finish - Start
Finish - Finish
Start - Finish
Start - Start

✔✔Analogus Estimates - ✔✔Based on similar work done in the past

✔✔Parametric Estimates - ✔✔dollar/ foot

✔✔Engineering Estimates - ✔✔Developed by client

✔✔Subcontractor Estimates - ✔✔Special tools and skills

✔✔Definitive Estimates - ✔✔Based on Materials and Labor

✔✔Bottom-Up Estimates - ✔✔Uses WBS Tasks

✔✔Pert Estimates - ✔✔(Optimistic + (Most Likely*4) + Pessimestic)/6

✔✔Four Versions of the Schedule Using the PERT Formula - ✔✔Optimistic View
Most Likely View
Pessimistic View
PERT View

✔✔Planned Value (PV) - ✔✔The authorized budget assigned to scheduled work.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
Follow You need to be logged in order to follow users or courses
Sold
171
Member since
1 year
Number of followers
6
Documents
18402
Last sold
2 days ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.6

31 reviews

5
12
4
6
3
7
2
0
1
6

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions