Lead Test Inspector Exam Questions With 100% Correct Answers | 2025/2026
Lead Test Inspector Exam Questions With 100% Correct Answers | 2025/2026 OSHA lead construction standard - answer-29CFR1926.62 What is the ten hour PEL - answer-40 mg/m3 (50 x 8 hrs/ hours worked = 400 / 10= 40) What is the OSHA PEL - answer-50 mg/m3 TWA What is OSHA Action Level - answer-30 mg/ m3 TWA Even after the lead-based paint has been weathered, chipped, peeled, or removed from painted surfaces it can still be available as a potential exposure source through. - answer--soil around the house and play area - contaminated dust within the house ( carpet and upholstered furniture) - contaminated dust on paved areas around the house, on sidewalks, alleys, streets and parkinglots HUD requires PHAs and IHAs to inspect what age facilities - answer-Pre-1978 In 1970 the U.S? Surgeon General issued a statement title" Medical Aspects of Children Lead Poisoning, which resulted in Public Law 91-695, the _________________________ in 1971. - answer-Lead-Based Paint Poisoning Prevention Act (LBPPPA) Lead exposure in construction- Permissible Exposure Limit (PEL) - answer-50 mg/m3 Lead exposure in construction- Action level - answer-30 mg/m3Lead is defined as how many parts per million - answer-5000 ppm, or 0.5% Lead exposure in construction- Allowable blood lead levels - answer-40mg/dl Ohio/HUD/EPA. Clearance for dust on floors is - answer-EPA and HUD= 40 mg/ft2 OHIO = 100 mg/ft2 Ohio/ HUD/EPA Clearance for dust on window sills is - answer-EPA and HUD =250 mg/ft2 Ohio = 500 mg/ft2 Ohio/HUD/EPA clearance for dust on window wells is - answer-EPA and HUD=400 mg/ft2 Ohio= 800 mg/ft2
Written for
- Institution
- Lead Inspector/Risk Assessor
- Module
- Lead Inspector/Risk Assessor
Document information
- Uploaded on
- October 15, 2025
- Number of pages
- 4
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
lead test inspector exam questions with 100 corre