TB TF Qu. 05-01 The term capacity refers to the maximum...
The term capacity refers to the maximum quantity an operating unit can process over a given period
of time.
True
False
An operation's capacity is defined as the maximum rate of output possible.
References
True / False Difficulty: 1 Easy
TB TF Qu. 05-01 Learning Objective:
The term 05-03 Describe
capacity refers ways of defining and
to the measuring capacity.
maximum...
,2. Award: 1.00 point
TB TF Qu. 05-02 Capacity decisions are usually one-time...
Capacity decisions are usually one-time decisions; once they have been made, we know the limits of
our operations.
True
False
A number of factors can either increase or reduce a unit's capacity over time. While capacity
decisions often involve long-term commitments, we need to monitor both our performance and
demand to identify needs to adjust capacity.
References
True / False Difficulty: 1 Easy
TB TF Qu. 05-02 Learning Objective:
Capacity 05-02 Explain the
decisions are importance of
usually one- capacity planning.
time...
,3. Award: 1.00 point
TB TF Qu. 05-03 Stating capacity in dollar amounts generally...
Stating capacity in dollar amounts generally results in a consistent measure of capacity regardless of
the actual units of measure.
True
False
The dollar value of a unit's output can change even though that unit's capacity hasn't.
References
True / False Difficulty: 2 Medium
TB TF Qu. 05-03 Learning Objective:
Stating capacity 05-03 Describe
in dollar ways of defining and
amounts measuring capacity.
generally...
, 4. Award: 1.00 point
TB TF Qu. 05-04 Design capacity refers to the maximum output...
Design capacity refers to the maximum output rate that can be achieved under ideal conditions.
True
False
Design capacity is the maximum output rate or service rate an operation, process, or facility is
designed for.
References
True / False Difficulty: 1 Easy
TB TF Qu. 05-04 Learning Objective:
Design capacity 05-03 Describe
refers to the ways of defining and
maximum measuring capacity.
output...