CEPSCI PRACTICE TEST WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL COMPLETE EXAM|ALREADY GRADED A+

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
06-10-2025
Written in
2025/2026

CEPSCI PRACTICE TEST WITH ALL CORRECT & 100% VERIFIED ANSWERS|ACTUAL COMPLETE EXAM|ALREADY GRADED A+

Institution
CEPSCI
Module
CEPSCI









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CEPSCI
Module
CEPSCI

Document information

Uploaded on
October 6, 2025
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CEPSCI PRACTICE TEST WITH ALL CORRECT & 100%
VERIFIED ANSWERS|ACTUAL COMPLETE EXAM|
ALREADY GRADED A+

1972 clean water act ✔Correct Answer-Administered by the US environmental protection agency
(EPA) Created the NPDES

1987 ✔Correct Answer-Amendment to CWA CALLED WATER QUALITY ACT

NPDES in south carolina ✔Correct Answer-South Carolina is NPDES delegated state.

NPDES regulations are administered by ✔Correct Answer-SCDHEC

CGP authorizes ✔Correct Answer-stormwater discharges from construction sites

Who must obtain NPDES coverage ✔Correct Answer-land disturbing activities greater than or
equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

NPDES permits are issued to ✔Correct Answer-operator-person or company for a particular
discharge

primary permittee ✔Correct Answer--has day to day operational control to ensure compliance
with SWPP
-typically the owner or developer

primary permittee responsibilites ✔Correct Answer-submit NOI, Preparation of the C_SWPPP

Secondary permittee ✔Correct Answer-individual lot owner or residential builder that conducts
land disturbing activity limited to an individual lot or group of lots as part of approved LCP of
development

contractors ✔Correct Answer-must on Contractor Certification- D-0437

On-Site SWPPP ✔Correct Answer-SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor
Certifications, Local Approvals, USACE approvals, Critical area permit(coast)

OS_SWPPP ✔Correct Answer-a copy of signed and certified SWPPP, NOI, and CGP coverage letter
from DHEC must be retained at site or electronically accessible

minor modification to ON-SWPPP ✔Correct Answer-minor modifications made directly in the
field,do not need approval by DHEC- additional BMP's, removal of disturbed areas

major modifications to OS-SWPPP ✔Correct Answer-must be made by qualified individual and
submitted to DHEC or appropriate delegated entity for approval

, Phased plan requirement > 5 ✔Correct Answer-include a phased stormwater management plan
which identifies all BMP's and grading work conducted during a specific portion of the sites
construction sequence. Each phase identified on at least one separate plan sheet.

Phased plan requirement < 10 but > 5 acres ✔Correct Answer-at least two separate plan phases
are required - initial land disturbance phase - stabilization phase

Phased plan requirement ≥ 10 acres ✔Correct Answer-at least 3 separate plan phases are required
- initial land disturbance phase - construction phase - stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the following ✔Correct
Answer-1. areas of site disturbed by construction activity and areas used for storage of materials
exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible,
nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

inspection frequency after construction begins ✔Correct Answer-at least once a week or within 24
hours of end of storm event >0.5 inches

Inspection frequency for sites that have reached temporary stablization ✔Correct Answer-Once
every month

Linear site inspection ✔Correct Answer-linear activites may limit access to disturbed areas, in such
cases representative inspections may be performed

representative inspections (linear site inspection) ✔Correct Answer-personnel must investigate
BMP's along the site for 0.25 miles above and below each access point where the site intersects with
-roadway - undisturbed right of way - other similar feature- Condition along each inspected segment
are considered "respresentative" along that reach of construction

permittees must record rainfall events of ✔Correct Answer-0.5 inches or greater

where should rainfall records be kept ✔Correct Answer-maintained in rain log located as part of
the OS-SWPPP

Inspection reports of rainfall must be ✔Correct Answer-reported on each weekly inspection report
and maintained in rain log

For each compliance inspecton a report must be completed and include at a mininum ✔Correct
Answer-1. Inspection date
2. Name, title, qualification of inspector
3. Weather information for period since last inspection
4.Weaher information and description of any discharges occurring at time of inspection.
5. Locations(s) of discharges of sediment or other pollutants leaving the site.
6. Location(s) of BMP's that need maintenance only.
7. Location of any BMPs that failed to operate as designed or have proven inadequate for a particular
location.
8. Location where additional BMPs are needed that did not exist at the time of inspection.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyclub Yale School Of Medicine
Follow You need to be logged in order to follow users or courses
Sold
19
Member since
11 months
Number of followers
0
Documents
8126
Last sold
1 week ago
"The Club for Top Academic Performance."

Welcome to StudyClub—the ultimate destination for students who want to make studying not only effective but also enjoyable! Whether you’re preparing for an exam, looking to improve your grades, or mastering new subjects, StudyClub is your go-to space to find the tools and resources you need to succeed. At StudyClub, I believe in the power of community. That’s why I’ve created a collection of high-quality study materials designed to simplify complex concepts and help you achieve your academic goals. Whether you’re an individual looking to study independently or a student seeking the support of a virtual study group, you’ll find everything you need to succeed. Join the StudyClub today, where learning is made easier, more organized, and—most importantly—more collaborative. Let’s grow together, learn smarter, and unlock your academic potential. Thank you for being part of the StudyClub community. I can’t wait to see you succeed!

Read more Read less
3.0

5 reviews

5
2
4
0
3
1
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions