100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

API 1169 Study Guide III Questions with All Correct Answers

Rating
-
Sold
-
Pages
5
Grade
A+
Uploaded on
19-09-2025
Written in
2025/2026

API 1169 Study Guide III Questions with All Correct Answers

Institution
API 1169
Module
API 1169









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
API 1169
Module
API 1169

Document information

Uploaded on
September 19, 2025
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

API 1169 Study Guide III Questions
with All Correct Answers

Where could an inspector find detailed info regarding test pressures and the duration of
the pressure test for a project - Answer-Site specific test procedure

Inspectors are required to make sure a plan is in place for - Answer-Rescue from a
confined space

What are some of the fall protection systems that can be used on work sites - Answer-
Barricades

This legislation covers hazardous substances, site contamination, and cleanup -
Answer-CERCLA

What is typically found on line lists - Answer-Specific agreements between the
landowner and the pipeline owner

The amount of residual air in the hydraulic test section should not exceed - Answer-5%
of the volume

When using a pressure relief valve (pop off valve) it should be set to - Answer-A
pressure just above max test pressure

Typically temperature and pressure data are recorded how often when hydro-testing -
Answer-Every 30 mins throughout the duration of the test

What info on stakes should an inspector understand - Answer-Pipeline stationing

How shall tensile strength (tensile testing) be computed - Answer-Divide the max load at
failure with the smallest cross-sectional area of the specimen

Where can pipeline locating and marking requirements be found - Answer-API 1169

Where might the inspector find landowner requirements such as the removal of
permanent fences - Answer-Line lists

What is the typical distance range between the new pipeline and other existing
structures - Answer-12" to 24"
If the pressure changes in a pipeline section being tested what other change is directly
related to this pressure change - Answer-Volume

, In the CGA best practices an icon of a green square identifies - Answer-Facility owner

What is the minimum stress relieving temperature for ferritic alloy steels - Answer-1200
F

The minimum cover required for a buried liquid pipeline running through a farmers corn
field would be - Answer-48"

Inspectors should have knowledge of OSHA 1926 Subpart P to ensure - Answer-
Ditching/excavations safety plan addresses the threat of cave in

A specimen at failure is observed to have a strength greater than or equal to the SMTS
of the pipe material and meets all soundness criteria but breaks in the weld or fusion
zone. Is the weld acceptable - Answer-Yes acceptable

What are some blasting activities that should be monitored - Answer-Permits and
precautions

Of particular interest to the inspector the following conditions should be noted - Answer-
Coating condition of the pipe

Available records (of underground facilities) should be available to all potential users
especially the - Answer-Locator

What regulation governs the safe working distances of pressure testing piping systems
with liquid petroleum, or inert gas or carbon dioxide operating at hoop stress levels >
50% of the SMYS - Answer-49 CFR 195

During handling, hauling, stringing, or storing the pipe shall not be allowed to - Answer-
Be dropped or strike objects

Inspectors should be aware of the provisions of environmental permits including? -
Answer-The different types and agency jurisdiction

Al B31.8 welders shall be requalified at least - Answer-One each year

Does an increase in minimum specified preheat temp constitute a change in an
essential variable - Answer-No but a decrease is

Notches or laminations in the ends of pipe sections shall - Answer-Not be repaired

Inspectors should be familiar with environmental requirements for crossings of
waterway crossings, water bodies, and wetlands, including - Answer-Understanding of
permit documentation requirements
£12.12
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
wisdompoint chamberlain college of nursing
Follow You need to be logged in order to follow users or courses
Sold
114
Member since
2 year
Number of followers
66
Documents
5393
Last sold
3 weeks ago
Nursing Tec

3.7

16 reviews

5
6
4
3
3
5
2
0
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions