Chapter 16 ISDS 3115 Exam Questions and Answers Fully Solved Latest Update What does TPS stand for? a. Total Production Streamlining b. Toyota Production System c. Taguchi's Production S's d. Total Process Simplification e. None of the above - Answers B Which of the following is generally found in most JIT environments? a. a push or pull system, depending upon the rate of demand b. a push system for high margin items and a pull system for low margin items c. a push system for purchased parts and a pull system for manufactured parts d. push systems e. pull systems - Answers E Which one of the following is not a benefit of the implementation of JIT? a. cost reduction b. variability increase c. rapid throughput d. quality improvement e. rework reduction - Answers B Which of the following is not a reason for variability? a. Employees, machines, and suppliers produce units late. b. Customer demand is unknown. c. Employees, machines, and suppliers produce units that conform to standards. d. Engineering drawings are inaccurate. e. Drawings or specifications are incomplete. - Answers C Which of the following is specifically characterized by a focus on continuous improvement, respect for people, and standard work practices? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban - Answers B Which of the following is specifically characterized by continuous and forced problem solving via a focus on throughput and reduced inventory? a. Just-in-time (JIT) b. Toyota Production System (TPS) c. Lean operations d. Material requirements planning (MRP) e. kanban - Answers A Which of the following statements regarding a pull system is true? a. Large lots are pulled from upstream stations. b. Work is pulled to the downstream stations before it is actually needed. c. Manufacturing cycle time is increased. d. Problems become more obvious. e. None of the above is true of a pull system. - Answers D Manufacturing cycle time is best defined as the a. length of the work shift, expressed in minutes per day b. time it takes a unit to move from one workstation to the next c. time between the start of one unit and the start of the next unit d. sum of all the task times to make one unit of a product e. time from raw materials receipt to finished product exit - Answers E If the goals of JIT partnerships are met, which of the following is a result? a. For incoming

Show more Read less
Institution
ISDS 3115
Module
ISDS 3115









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ISDS 3115
Module
ISDS 3115

Document information

Uploaded on
September 10, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

Chapter 16 ISDS 3115 Exam Questions and Answers Fully Solved Latest Update 2025-2026

What does TPS stand for?

a. Total Production Streamlining

b. Toyota Production System

c. Taguchi's Production S's

d. Total Process Simplification

e. None of the above - Answers B

Which of the following is generally found in most JIT environments?

a. a push or pull system, depending upon the rate of demand

b. a push system for high margin items and a pull system for low margin items

c. a push system for purchased parts and a pull system for manufactured parts

d. push systems

e. pull systems - Answers E

Which one of the following is not a benefit of the implementation of JIT?

a. cost reduction

b. variability increase

c. rapid throughput

d. quality improvement

e. rework reduction - Answers B

Which of the following is not a reason for variability?

a. Employees, machines, and suppliers produce units late.

b. Customer demand is unknown.

c. Employees, machines, and suppliers produce units that conform to standards.

d. Engineering drawings are inaccurate.

e. Drawings or specifications are incomplete. - Answers C

, Which of the following is specifically characterized by a focus on continuous improvement,
respect for people, and standard work practices?

a. Just-in-time (JIT)

b. Toyota Production System (TPS)

c. Lean operations

d. Material requirements planning (MRP)

e. kanban - Answers B

Which of the following is specifically characterized by continuous and forced problem solving
via a focus on throughput and reduced inventory?

a. Just-in-time (JIT)

b. Toyota Production System (TPS)

c. Lean operations

d. Material requirements planning (MRP)

e. kanban - Answers A

Which of the following statements regarding a pull system is true?

a. Large lots are pulled from upstream stations.

b. Work is pulled to the downstream stations before it is actually needed.

c. Manufacturing cycle time is increased.

d. Problems become more obvious.

e. None of the above is true of a pull system. - Answers D

Manufacturing cycle time is best defined as the

a. length of the work shift, expressed in minutes per day

b. time it takes a unit to move from one workstation to the next

c. time between the start of one unit and the start of the next unit

d. sum of all the task times to make one unit of a product

e. time from raw materials receipt to finished product exit - Answers E
£8.41
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TutorJosh Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
361
Member since
1 year
Number of followers
16
Documents
29352
Last sold
17 hours ago
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

56 reviews

5
19
4
15
3
12
2
0
1
10

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions