Unit 5: Data Modelling - Assignment 2 & 3 (Learning Aim B & C) (All Criterias Met)
Data Modelling – Assignment 2 Introduction: In this assignment, I have recently been chosen to join a new company as a trainee data analyst. Firstly, I will be willing to produce an efficient spreadsheet model which can predict the potential impact of exchange rate fluctuations on the company profit margins. From this, I will create designs for a data model so that each of the client requirements are met successfully which will include worksheet structure diagrams and being able to provide a test plan. Then, I will be reviewing the design with other clients to identify and inform improvements. Furthermore, I will be explaining my justification to how the requirements are fully fulfilled and then providing a well- detailed and reasoned evaluation of the optimised data model against client requirements that already exist. Nature of the problem: The nature of the problem is that number of challenges that the user has previously been faced and this would be the currency change issue that resulted with inaccuracy with both pounds and euros. Functions the model must perform: For the section, there are many functions that the model must perform. Generally, these functions require complex calculation that is built in the project named “Microsoft Excel”. The functions that currently exist in this project are: SUM – This function will be used to calculate the total cost between number1 and number2 by adding up these together. An example could be adding all numbers in the cells of B1 and F5 and then providing the equals sign to get the total cost of the product. AVERAGE – This function is used to average all the numbers in the cells from B1 to F5. Also, this function can also be entered as part of a formula in a cell of a worksheet. COUNT – This function is usually used to count the number of cells that contains numbers and then counts the numbers within the list of arguments. Additionally, this function will get the number of entries in a number field that Name: xxxxxxxxx Unit 5 – Learning Aim B Date: 13/06/2019 includes range of array of numbers. An example of this could be entering the following formula to count the numbers in the range. COUNTIF – This function is generally used to count how many numbers in cells B1 to F5 are higher than 50. Also, it will also be used to count how many 70s are in the cells from B1 to F5. The counting process will be IF – This function can perform a logical test to check whether the conditions are met and returns one value of false and another value of true. For instance, if the exchange rate of 0.7 is greater 0.3 or 0.6, it would result with a pass but if it is less then it will result with a fail instead. LOOKUP – This function would be used to search one column and would return the corresponding value from another one-column or one-row range. In general, the function “LOOKUP” would make it useful for solving certain problems in Excel. For example, if I wanted to search for a value of the total currency (in pounds), I would select that specific column and then another column to find an overall value. User interface: The user interface will consider including a minimum of at least two or three design layouts. In addition to this, I will be using Microsoft Excel to provide all the data into an entity and from this, I will be drawing rough designs to include the display of how my data model will look like before implementing this. Furthermore, my table will contain links such as including buttons so that it navigates to another page. The other page will be my form to include the labels and fields for users to input information. Also, I will also comprise a data analyst such as graphs to track the changes being made and if the costs of sale are lower or higher predicting the results to be changed over time. Constraints: For this part, I will be considering the constraints that could occur during the process of my data modelling using the project “Microsoft Excel”. This would help me to improve and make sure that I do not encounter the same problems again in the future. One of these constraints will include: Time – This will be one of the constraint issues that can exist as I may not have enough time to finish off the project and to make it accurate and efficient as possible. Furthermore, the limit of time could affect me with calculations as it
Written for
- Study Level
-
BTEC
- Examinator
-
PEARSON (PEARSON)
Document information
- Uploaded on
- July 16, 2025
- Number of pages
- 30
- Written in
- 2024/2025
- Type
- ESSAY
- Professor(s)
- Unknown
- Grade
- A+
Subjects
- unit 5 data modelling
- unit 5
- unit 5 data modelling
-
unit 5 data modelling assignment 2 3 learni
-
data modelling assignment 2 3
-
unit 5 data modelling assignment 2 3 learni