CPE QUESTIONS AND ANSWERS
100% CORRECT
3.Which A (Aging) indicator displays in the recoverable/ reparable conversion by
YOBUX TRANSATION IF THE RETURN (ZRL/ZRX) PR is 36 days old - ANSWERC.
RED
4.What screen title displays in the initial screen of the migo transaction . -
ANSWERA. The screen title depends on the last movement type that was posted.
5.what is the menu path used to enter time confirmation and complete a work order.
- ANSWERA. Order>confirmation >overall completion confirmation
6.what number is associated with the status that is used to deadline the equipment. -
ANSWERA. 30
7. When creating a dispatch (d1) notification , what cannot be done before the
notification is saved and the notification number is generated - ANSWERC .the
equipment dispatch 5987 form cannot be printed
How long has the notifications that deadline the equipment been open -
ANSWERNotification to 2000146685 Has been open since 1224 2014
What date was the material Received by the unit - ANSWER11/03/2014
Which purchase requisition document type is used to turning a recoverable
repairable material for Remote customers to the SSA - ANSWERZRX
Which is the on hand quantity of a bench stock material - ANSWERTwo
How many miles did the equipment travel during the dispatch - ANSWER40.2
How many pieces of equipment are currently deadlined due to maintenance in the
unit - ANSWER2
What is the number of the inbound delivery that is associated with a dedicated order
from national - ANSWER180008205
Which button do you click to display the listing of the classes of supply they can be
requisition by the MRP area - ANSWERExt. Matl group