100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CPESC Latest update Questions and 100% Correct Answers

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
10-03-2025
Written in
2024/2025

CPESC Latest update Questions and 100% Correct Answers

Institution
CPESC
Module
CPESC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CPESC
Module
CPESC

Document information

Uploaded on
March 10, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CPESC Latest update Questions and 100% Correct
Answers

When does the SWPPP need to be completed? - ✔✔2.3.6.4
Prior to submitting the NOI.



When does the EPA's construction permit require inspections? - ✔✔Every 7 days, or within
24 hrs of a storm of 0.5 inches or move in depth.



What does CPESC stand for? - ✔✔Certified Professional in Erosion & Sediment Control



What are the two types of Storm Water Permits? - ✔✔2.2.1


1. General: provides umbrella coverage to a large number of applicants.


2. Individual: designed to fit the specific requirements of a particular applicant, facility, or
activity.


True/False: A site initially disturbing 1/2 acre, that is part of a 3.5 acre future development is
not required to obtain a permit for the 1/2 acre. - ✔✔2.1.1.8
False, If it as part of a larger plan of development >1 acre, a permit is required.


Name 3 of the 5 types of Phase I facilities under section 402 of the CWA as of 1987. -
✔✔2.1.1.2
-Facilities already covered by a permit
-Facilities that engage in industrial activity
-Large (>250K pop) MS4s

, -Medium (100K250K) MS4s
-Facilities that EPA admin deems "significant contributors" of pollutants to WOTUS


Who is responsible for applying for the Storm water permit for a construction site? -
✔✔2.3.1
The operator of the site, however a owner can apply if the operator has not been identified.



What is an NOI? - ✔✔2.2.4
"Notice of Intent" to be covered by a general permit in the state in which the facility is located.



List the 6 major phases of a SWPPP for construction activities? - ✔✔2.3.6
-Site Evaluation/design development (site plan)
-Assessment (site area/runoff calc)
-Control selection and plan design (BMPs)
-Certification/notification (NOI)
-Construction/implementation (install/maintenance)
-Final stabilization/termination (NOT)



What score do you need to pass each section of the test? - ✔✔70%



What is the deadline to stabilize a site that wont be redisturbed? - ✔✔2.3.6.3
14 days



What is the deadline to correct problems found during an inspection? - ✔✔2.3.6.5
As soon as possible but no later than 7 days.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER New York College Of Dentistry
Follow You need to be logged in order to follow users or courses
Sold
340
Member since
2 year
Number of followers
104
Documents
38346
Last sold
3 days ago

3.4

57 reviews

5
25
4
8
3
7
2
1
1
16

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions