SWPPP EXAM QUESTIONS AND ACCURATE ANSWERS 2024/2025 | VERIFIED
The law that set into place stormwater regulations in the 1970s is - ✔️✔️The Clean Water Act
Regulations for managing stormwater activity on a construction site are outlined in the - ✔️✔️NPDES
When should you read and understand your project stormwater pollution prevention plan -
✔️✔️Immediately after the project awarded and before you begin any site work is
Which of the following is not an allowable stormwater discharge or non-stormwater discharge -
✔️✔️Discharges are contaminated groundwater
Construction activity may begin - ✔️✔️When the jurisdiction of operation specifies you can start
Waters that sell anti-degration standards are placed on the _______ list - ✔️✔️303D
SWPP certifications are signed by - ✔️✔️An officer of the project owner or an officer of the general
contractor.
TRUE OR FALSE: The document that must be completed signed and submitted to the state to obtain
authorization to discharge is the NOT - ✔️✔️False
The notice of termination can be filed when - ✔️✔️All construction inside and outside of the building is
completed and the final stabilization has been verified as complete
Operators on a construction site are the entity in charge of plans and specifications and the entity who is
- ✔️✔️Is in charge of daily activities
You should have a SWPPP for your construction site because (3 reasons) - ✔️✔️1. Its documents
stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
, A well constructed SWPPP for your site should be - ✔️✔️Site specific
The NO must be submitted - ✔️✔️Prior to you commencing construction
One necessary component of a good SWPPP is - ✔️✔️A schedule of activities
Factors that may impact the SWPPP scheduling activities include - ✔️✔️Weather and climate
Pollutant sources on a construction site may include (3) - ✔️✔️1. petroleum storage tanks
2. Masonry material
3. soil amendment
The following considerations may be incorporatedd into SWPPP - ✔️✔️Endangered species and
historical preservation
If you beileve BMP modifications are necessary onsite you must, - ✔️✔️Seek written approval of the
project SWPPP designer and project owner
The SWPPP will contain the following (3) - ✔️✔️1. Erosion and sediment control bet management
practices
2. A site specific sequence of construction activiites
3. site maps
Once a site has experienced a rain event of measurable quantity you must identify - ✔️✔️Deficit and
fialed BMP's and repair
The document that contains the permit number is - ✔️✔️The permit authorization letter
The portion of the the SWPPP that specifies the content of the SWPPP is - ✔️✔️The table of contents
The law that set into place stormwater regulations in the 1970s is - ✔️✔️The Clean Water Act
Regulations for managing stormwater activity on a construction site are outlined in the - ✔️✔️NPDES
When should you read and understand your project stormwater pollution prevention plan -
✔️✔️Immediately after the project awarded and before you begin any site work is
Which of the following is not an allowable stormwater discharge or non-stormwater discharge -
✔️✔️Discharges are contaminated groundwater
Construction activity may begin - ✔️✔️When the jurisdiction of operation specifies you can start
Waters that sell anti-degration standards are placed on the _______ list - ✔️✔️303D
SWPP certifications are signed by - ✔️✔️An officer of the project owner or an officer of the general
contractor.
TRUE OR FALSE: The document that must be completed signed and submitted to the state to obtain
authorization to discharge is the NOT - ✔️✔️False
The notice of termination can be filed when - ✔️✔️All construction inside and outside of the building is
completed and the final stabilization has been verified as complete
Operators on a construction site are the entity in charge of plans and specifications and the entity who is
- ✔️✔️Is in charge of daily activities
You should have a SWPPP for your construction site because (3 reasons) - ✔️✔️1. Its documents
stormwater management
2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
, A well constructed SWPPP for your site should be - ✔️✔️Site specific
The NO must be submitted - ✔️✔️Prior to you commencing construction
One necessary component of a good SWPPP is - ✔️✔️A schedule of activities
Factors that may impact the SWPPP scheduling activities include - ✔️✔️Weather and climate
Pollutant sources on a construction site may include (3) - ✔️✔️1. petroleum storage tanks
2. Masonry material
3. soil amendment
The following considerations may be incorporatedd into SWPPP - ✔️✔️Endangered species and
historical preservation
If you beileve BMP modifications are necessary onsite you must, - ✔️✔️Seek written approval of the
project SWPPP designer and project owner
The SWPPP will contain the following (3) - ✔️✔️1. Erosion and sediment control bet management
practices
2. A site specific sequence of construction activiites
3. site maps
Once a site has experienced a rain event of measurable quantity you must identify - ✔️✔️Deficit and
fialed BMP's and repair
The document that contains the permit number is - ✔️✔️The permit authorization letter
The portion of the the SWPPP that specifies the content of the SWPPP is - ✔️✔️The table of contents