Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Electrical Wiring: Commercial 18th Edition (Simmons, Mullin & ODE) – Solution Manual and Practice Problem Answers for Exam Preparation

Rating
-
Sold
-
Pages
128
Grade
A+
Uploaded on
16-02-2025
Written in
2024/2025

This document is a solution manual for Electrical Wiring: Commercial (18th Edition) by Simmons, Mullin, and ODE. It provides step-by-step solutions and worked answers to problems covering commercial electrical wiring concepts, installation practices, safety procedures, and code applications. The material is designed to support students in understanding complex calculations and preparing for exams and practical assessments in electrical studies.

Show more Read less
Institution
Electrical Wiring Commercial Wiring
Module
Electrical wiring commercial wiring

Content preview

Electrical
Electrical
Wiring Commercial
Wiring Commercial
18th Edition
18th Edition
by Phil Simmons
by Phil Simmons
Complete
Complete
ChapterChapter
Solutions
Solutions
Manual Manual
are included
are included
(Ch 1 to(Ch
https://www.stuvia.com/user/parkrobertson99
21).pdfhttps://www.stuvia.com/user/parkrobertson99
1 to 21).pdfhttps://www.stuvia.com/user/parkrobert




Solution and Answer Guide
SIMMONS/ODE, ELECTRICAL WIRING COMMERCIAL, 18E © 2024, 9780357767115; CHAPTER 1:
COMMERCIAL BUILDING PLANS AND SPECIFICATIONS


TABLE OF CONTENTS
Review ..................................................................................................................................1



Note to instructor: It is recommended that students be required to respond, where
appropriate, with answers that are complete sentences.


REVIEW
Refer to the National Electrical Code or the working drawings when necessary. Where
applicable, responses should be written in complete sentences.

1. What section of a commercial building’s specification contains a list of contract
documents?

Answer: A list of the contract documents is contained in General Clauses and
Conditions. A listing of the Commercial Building contract documents is presented in
this chapter under the heading “Commercial Building Plans.” The instructor may wish
to have the students check over this listing and compare it with the plans provided.
2. The requirement for temporary light and power at the job site will be found in what
portion of a commercial building’s specification?

Answer: The Supplementary General Conditions specifies the job site requirements for
temporary light and power. In some contracts, this electrical system becomes the
responsibility of the general contractor; in other contracts, it is the electrical
contractor’s responsibility to install and maintain the temporary electrical system. The
instructor may wish to refer the student to NEC Article 590 and discuss the
requirements in detail.




https://www.stuvia.com/user/parkrobertson99
Electrical Wiring Commercial
https://www.stuvia.com/user/parkrobertson99
18th Edition by Phil Simmons Complete Chapter Solutions Manual are included (Ch 1 to 21).pdf

,Electrical
Electrical
Wiring Commercial
Wiring Commercial
18th Edition
18th Edition
by Phil Simmons
by Phil Simmons
Complete
Complete
ChapterChapter
Solutions
Solutions
Manual Manual
are included
are included
(Ch 1 to(Ch
https://www.stuvia.com/user/parkrobertson99
21).pdfhttps://www.stuvia.com/user/parkrobertson99
1 to 21).pdfhttps://www.stuvia.com/user/parkrobert




3. The electrician uses the Schedule of Working Drawings for what purpose?

Answer: The electrician uses the Schedule of Working Drawings to determine whether
all of the drawings are at hand. The information on “the other sheets” may be very
important, especially in coordinating with other contractors.

4. Complete the following items by indicating the letter(s) designating the correct
source(s) of information:

No. Answer Item Information


4. Sections Ceiling height Sections, Sheet A6


5. Electrical Electrical receptacle Electrical symbol schedule, Chapter 2,
symbol style Figure 2–6
schedule


6. Electrical Electrical outlet Electrical layout drawings, Sheets El,
layout location E2, and E3
drawings


7. Elevations Exterior wall finishes Elevations, Sheets A4 and A5


8. Site plan Grading elevations Site plan, Sheet A4


9. Electrical Panelboard schedules Electrical layout drawings, Sheet E4
layout
drawings


10. Architectural Room width Architectural floor plan, Sheets Al, A2,
floor plan and A3


11. Architectural Swing of door Architectural floor plan, Sheets Al, A2,
floor plan and A3


12. Sections View of interior wall Sections, Sheet A6

Match the items on the left with those on the right by writing the letter designation of
the appropriate organization from the list on the right.

13. NEC Electrical Code National Electrical Code (NEC)


14. IAEI Electrical inspectors International Association of Electrical
Inspectors (IAEI)




https://www.stuvia.com/user/parkrobertson99
Electrical Wiring Commercial
https://www.stuvia.com/user/parkrobertson99
18th Edition by Phil Simmons Complete Chapter Solutions Manual are included (Ch 1 to 21).pdf

,Electrical
Electrical
Wiring Commercial
Wiring Commercial
18th Edition
18th Edition
by Phil Simmons
by Phil Simmons
Complete
Complete
ChapterChapter
Solutions
Solutions
Manual Manual
are included
are included
(Ch 1 to(Ch
https://www.stuvia.com/user/parkrobertson99
21).pdfhttps://www.stuvia.com/user/parkrobertson99
1 to 21).pdfhttps://www.stuvia.com/user/parkrobert




15. NFPA Fire codes National Fire Protection Association
(NFPA)


16. IESNA Lighting information Illuminating Engineering Society of
North America (IESNA)


17. UL Listing service Underwriters Laboratories, Inc. (UL)


18. NEMA Manufacturers’ National Electrical Manufacturers
standards Association (NEMA)


19. PE Seal Professional Engineer (PE)

Match the items on the left with those on the right by writing the letter designation of
the proper level of NEC interpretation from the list on the right.

20. with special Allowed by the Code Shall be permitted, or Shall not be
permission required, NEC


21. with special May be done Shall be permitted, or Shall not be
permission required, NEC


22. shall Must be done Shall, National Electrical Code


23. shall Required by the Code Shall, National Electrical Code


24. never Up to the electrician Shall be permitted, or Shall not be
required, NEC

25. Find NEC 250.52(A)(5) and record the first four words.

Answer: The first four words of NEC 250.52(A)(5) are Rod and pipe electrodes.
Show required conversion calculations for problem 26 and problem 27.

26. Luminaire style F is four feet long. The length in SI units, as specified by the NEC, is

Answer: The length in SI units is 1.22 m; 4 ft × 0.3048 m/ft = 1.2192 m. As will be
discussed later, this luminaire is now called a 4 by 2 or the equivalent 1200 by 600 in
metric terms. This question assumes that the luminaire is exactly 4 ft long.
27. The gross area of the drugstore basement is 1395 square feet. The area in square
meters is

Answer: The area in SI units is 129.7 sq. m; 1395 sq. ft × 0.093 sq. m/sq. ft = 129.7 sq.
m.




https://www.stuvia.com/user/parkrobertson99
Electrical Wiring Commercial
https://www.stuvia.com/user/parkrobertson99
18th Edition by Phil Simmons Complete Chapter Solutions Manual are included (Ch 1 to 21).pdf

, Electrical
Electrical
Wiring Commercial
Wiring Commercial
18th Edition
18th Edition
by Phil Simmons
by Phil Simmons
Complete
Complete
ChapterChapter
Solutions
Solutions
Manual Manual
are included
are included
(Ch 1 to(Ch
https://www.stuvia.com/user/parkrobertson99
21).pdfhttps://www.stuvia.com/user/parkrobertson99
1 to 21).pdfhttps://www.stuvia.com/user/parkrobert




To answer Questions 28–31, refer to the Plans included with this book. Determine the
Following dimensions. Write the dimensions using unit names, not symbols (for example, 1
foot, not 1’), and indicate the source of the information.

28. What is the inside clear distance of the interior stairway to the drugstore basement?

Answer: The inside clear distance of the interior stairway to the Drugstore basement is
4 ft 0 in. (1.22 m), as scaled from Sheet A2.
29. What is the gross square footage of each floor of the building?

Answer: The gross area of each floor of the building is 60 ft × 43 ft = 2580 sq. ft (18.82
m × 13.1 m = 246.5 sq. m), as taken from Sheets Al, A2, and A3.
30. What is the distance in the drugstore from the exterior block wall to the block wall
separating the drugstore from the bakery?

Answer: The distance from the exterior block wall in the Drugstore to the block wall
separating the Drugstore from the Bakery is 21 ft 7 in. (6.58 m), as shown on Sheet A2.
31. What is the finished floor to finished ceiling height on the second floor?

Answer: The finished floor to finished ceiling height on the second floor is 8 ft 6 in.
(2.59 m), as available from East and West Elevations A41–2, and Sheet A6, Cross
Sections A–A and B–B.
For problems 32–34, cite the NEC source. We will show the method of using the NEC
Index for the first two questions in Chapter 1 and will provide this same method of
locating requirements in other chapters of this book.

32. The standard ampere ratings for fuses and fixed trip circuit breakers.

Answer: The standard ampere rating for fuses and fixed trip circuit breakers is given in
NEC Table 240.6(A).
To find this information in the Index of the NEC, locate “Circuit breakers, Article 240, and
locate Rating and under that locate Fixed-Trip circuit breakers, 240.6(A)…” This will
provide the Section number for the ratings.

33. The minimum bending radius for metal-clad cable with a smooth sheath with an
external diameter of 1 in.

Answer: The minimum bending radius for metal clad cable with a smooth sheath with
an external diameter of 1 in. (size 1) is given in NEC 330.24(A)(2) as 12 times the
diameter.
To find this information in the Index of the NEC, locate “Metal-clad Cable, Article 330, and
under that locate “Bends, 330.24.” 330.24(A)(2).

34. The permission to use splices in busbars as grounding electrode conductors.

Answer: The permission to use splices in busbars as a grounding electrode conductor
is given in NEC 250.64(C)(2).




https://www.stuvia.com/user/parkrobertson99
Electrical Wiring Commercial
https://www.stuvia.com/user/parkrobertson99
18th Edition by Phil Simmons Complete Chapter Solutions Manual are included (Ch 1 to 21).pdf

Written for

Institution
Electrical wiring commercial wiring
Module
Electrical wiring commercial wiring

Document information

Uploaded on
February 16, 2025
File latest updated on
April 12, 2026
Number of pages
128
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£16.21
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
parkrobertson99 Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
12740
Member since
1 year
Number of followers
8
Documents
756
Last sold
5 days ago

4.8

6 reviews

5
5
4
1
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions