100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

GE CCC EXAM 2025 QUESTIONS & ANSWERS SOLVED 100% CORRECT!!

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
30-01-2025
Written in
2024/2025

GE CCC EXAM 2025 QUESTIONS & ANSWERS SOLVED 100% CORRECT!!

Institution
GE CCC
Module
GE CCC

Content preview

GE CCC EXAM 2025 QUESTIONS & ANSWERS
SOLVED 100% CORRECT!!


Define: General Engineering Answer - Those engineering capabilities and
activities, other than combat engineering, that modify, maintain, or protect the
physical environment.


Examples include: the construction, repair, maintenance, and operation of
infrastructure, facilities, lines of communication and bases; terrain modification
and repair; and selected explosive hazards activities.
(ATP 3-34.40 General Engineering)


Base Camp Principles Answer - Scalability:
- ability to tolerate population fluctuations and incorporate changes in the base
camp mission, level of services, or force protection level, without the need for
redesign.


Sustainability:
- ability to maintain the necessary level and duration of sustainment/logistics
support to achieve military objectives.


Standardization:
- The Standardization of base camp policies, Service standards, guidance,
system solutions, standard designs, and construction provides consistent
expectations for commanders and drives the repetitive use of proven best
practices and TTP


Survivability:

,- A primary purpose of base camps is providing a protected location from which
to project and sustain combat power.


Types of Base Camps Answer - Base: A locality from which operations are
projected or supported (JP 3-10)


Base Camp: A base camp is an evolving military facility that supports the
military operations of a deployed unit and provides the necessary support and
services for sustained operations.


Intermediate Staging Base: A tailorable, temporary location used for for staging
forces, sustainment, and/or extraction into and out of an operational area.


Forward Operating Base: An area used to support tactical operations without
establishing full support facilities


Base Camp Duration Answer - Phase: Contingency
• Organic - Up to 90 Days


• Initial - Up to 6 months


• Temporary - Up to 5 years


• Semi permanent - 2-10 years


Phase: Enduring
• Permanent - 5 years or longer

, Base Camp Life Cycle Answer - Planning and Design


Construction


Operations


Transfer & Closure


USACE Contingency Elements (UCE) Answer - 1. FEST-A or RT (Forward
Engineer Support Team-Advance or Reconnaissance Team)


2. Advanced Echelon (ADVON) Team


3. Contingency Engineer District (CED)


Types of Technical Reconnaissance Answer - Infrastructure Assessment and
Reconnaissance: Think SWEAT-MSO. Sewage, Water, Electricity, Academics,
Trash, Medical, Safety, Other Considerations


Environment Assessment: focused on collecting technical information on
existing environmental conditions and identifying areas that are
environmentally sensitive or of relative environmental concern.


Airfield Assessment: An airfield assessment is conducted to collect detailed
technical information on selected airfields and heliports. The information
collected can be used to determine the airfield operating capacity and to
estimate resources for repair or upgrade of the airfield and its supporting
facilities.

Written for

Institution
GE CCC
Module
GE CCC

Document information

Uploaded on
January 30, 2025
Number of pages
28
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EvaTee Phoenix University
Follow You need to be logged in order to follow users or courses
Sold
5034
Member since
4 year
Number of followers
3558
Documents
52708
Last sold
6 hours ago
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

919 reviews

5
439
4
160
3
168
2
47
1
105

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions