100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

NERC CERTIFICATE EXAM LATEST 2025 WITH ACTUAL QUESTIONS AND CORRECT ANSWERS

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
27-01-2025
Written in
2024/2025

NERC CERTIFICATE EXAM LATEST 2025 WITH ACTUAL QUESTIONS AND CORRECT ANSWERS

Institution
NERC CERTIFICATE
Module
NERC CERTIFICATE










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NERC CERTIFICATE
Module
NERC CERTIFICATE

Document information

Uploaded on
January 27, 2025
Number of pages
29
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

NERC CERTIFICATE EXAM LATEST 2025
WITH ACTUAL QUESTIONS AND CORRECT
ANSWERS

True/False


According to the NERC Functional Model, there is no difference between the
function and the entity.


A) True
B) False - CORRECT ANSWER-B) False


True/False


Analysis type questions are designed to be the least complex from a human
cognitive process.


A) True
B) False - CORRECT ANSWER-B) False


True/False


A Transmission Service Provider is an entity that both owns and operates
transmission facilities on the Bulk Electric System.


A) True

,B) False - CORRECT ANSWER-B) False


True/False


The NERC Functional Model is designed so that the functions of Generator
Owner and Generator Operator can be performed by two different entities.


A) True
B) False - CORRECT ANSWER-A) True


How many forms of identification are required when taking the NERC System
Operator Certification exam?


A) 4
B) 9
C) 1
D) 2 - CORRECT ANSWER-2


The NERC came into existence as a result of the Electric Power Reliability Act of
what year?


A) 1958
B) 2005
C) 1967
D) 1997 - CORRECT ANSWER-1967


How many certification credentials does NERC have examinations for?

, A) 2
B) 4
C) 6
D) 3 - CORRECT ANSWER-4


Match the acronym with the appropriate organization.


FERC North American Electric Reliability Corp


NERC Florida Reliability Coordinating Council


FRCC Reliability First


RF Federal Energy Regulatory Commission - CORRECT ANSWER-1. FERC Federal
Energy Regulatory Commission
2. NERC North American Electric Reliability Corporation
3. FRCC Florida Reliability Coordinating Council
4. RF Reliability First


True/False
Balancing Authorities are responsible to ensure that transmission facilities are
operated within the limits that are established by the Transmission Owners. -
CORRECT ANSWER-False


The first power pool in the industry was created in 1927 and was known as
which of the following? - CORRECT ANSWER-Pennsylvania-New Jersey
Interconnection

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Doctordih Chamberlain College Nursing
Follow You need to be logged in order to follow users or courses
Sold
70
Member since
2 year
Number of followers
40
Documents
1055
Last sold
5 months ago

4.9

483 reviews

5
459
4
12
3
8
2
2
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions