General Requirements ICC | Q&A Latest 2024/2025 | 100% PASS
General Requirements ICC | Q&A Latest 2024/2025 | 100% PASS The type and extent of each special inspection shall be located in - Answer -The statement of special inspection Who has the legal authority to enforce the special inspection provisions of the building code - Answer -Building official Who can hire an approved inspection agency - Answer -Owners agent Who can perform a structural observation - Answer -Registered design professional Who is required to receive the final report - Answer -Building department All of the following should be performed by the special inspector on the job site except - Answer -Stop work when non-conforming items are observed Who is responsible for providing access to the approved plans - Answer -General contractor Who shall the special inspector demonstrate competence to - Answer - Building official Who can issue a stop work order - Answer -Building official What type of inspection is required for post installed adhesive anchors (epoxy) placed in a horizontal pos
Written for
- Institution
- Icc ust service technician
- Module
- Icc ust service technician
Document information
- Uploaded on
- January 23, 2025
- Number of pages
- 6
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
general requirements icc 2024
-
general requirements icc 2025
-
the type and extent of each special inspection sha
Also available in package deal