100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

FDOT ASPHALT PAVING LEVEL 2 EXAM QUESTIONS WITH 100% CORRECT ANSWERS [ GUARANTEED A+]

Rating
-
Sold
-
Pages
23
Grade
A+
Uploaded on
01-01-2025
Written in
2024/2025

FDOT ASPHALT PAVING LEVEL 2 EXAM QUESTIONS WITH 100% CORRECT ANSWERS [ GUARANTEED A+] What makes up a quality asphalt mixture? - A quality asphalt mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies functional requirements. CQC - contractor quality control Superpave - Asphalt mix design system since 1998 ©morren2024/2025.Year published 2024. QCP - Quality control plan QCM - Quality control Manual QC - Quality Control (Contracting Testing and Inspection) VT - Verification Testing (FDOT or CEI Verification) CEI - Construction Engineering and Inspection RT - Resolution Testing (FDOT) IV - Independent Verification Testing ©morren2024/2025.Year published 2024.

Show more Read less
Institution
Module










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Module

Document information

Uploaded on
January 1, 2025
Number of pages
23
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

FDOT ASPHALT PAVING LEVEL 2 EXAM

QUESTIONS WITH 100% CORRECT

ANSWERS [ GUARANTEED A+]




What makes up a quality asphalt mixture? - ✔✔A quality asphalt

mixture is determined by the constructability, if it conforms to

Specifications, and if it satisfies functional requirements.




CQC - ✔✔contractor quality control




Superpave - ✔✔Asphalt mix design system since 1998




©morren2024/2025.Year published 2024.

,QCP - ✔✔Quality control plan




QCM - ✔✔Quality control Manual




QC - ✔✔Quality Control (Contracting Testing and Inspection)




VT - ✔✔Verification Testing (FDOT or CEI Verification)




CEI - ✔✔Construction Engineering and Inspection




RT - ✔✔Resolution Testing (FDOT)




IV - ✔✔Independent Verification Testing



©morren2024/2025.Year published 2024.

, IA - ✔✔Independent Assurance Testing




The decision-making authority on a job needs to be given to who? -

✔✔Needs to be given to the level closet to the work as specified in the

specifications. It ensure a quick handle on situations and issues.




The governing order of project documents from high (1) to low (7)

starts with the highest being - ✔✔Special Provisions




The governing order of project documents from high to low (2) -

✔✔Technical Special Provisions




©morren2024/2025.Year published 2024.
£8.35
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
morren

Get to know the seller

Seller avatar
morren Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
2
Documents
1269
Last sold
1 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions