COSC 275: Exam 1 Palmer UPDATED ACTUAL Exam Questions and CORRECT Answers Estimating - CORRECT ANSWER - The process of determining the anticipated cost of materials, labor, and equipment of a proposed project. Take-Off - CORRECT ANSWER - The process in which detailed lists are compiled, based on drawings and specifications, of all the material and equipment necessary to construct a project. The cost estimator uses this list to calculate how much it will cost to build the projec

Show more Read less
Institution
Cosc
Module
Cosc









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Cosc
Module
Cosc

Document information

Uploaded on
December 15, 2024
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

COSC 275: Exam 1 Palmer UPDATED
ACTUAL Exam Questions and CORRECT
Answers
Estimating - CORRECT ANSWER - The process of determining the anticipated cost of
materials, labor, and equipment of a proposed project.


Take-Off - CORRECT ANSWER - The process in which detailed lists are compiled, based
on drawings and specifications, of all the material and equipment necessary to construct a
project. The cost estimator uses this list to calculate how much it will cost to build the project.


Quantities - CORRECT ANSWER - Measured amounts of construction items expressed in
their customary units.


Quantification - CORRECT ANSWER - In estimating an activity to translate project scope
information into resource quantities suitable for costing. In the engineering and construction
industry, a takeoff is a specific type of quantification that is a measurement and listing of
quantities of materials from drawings.


Quantity Survey - CORRECT ANSWER - A detailed analysis of material and equipment
required to construct a project.


Area - CORRECT ANSWER - A measurement of a given planar region or of the surface of
a solid


Area Method - CORRECT ANSWER - A construction cost estimating system employing
unit square foot costs multiplied by the adjusted gross floor area of a building.


Length - CORRECT ANSWER - The longest dimension of an object

, Linear Measurement - CORRECT ANSWER - A unit or system of units for measuring
length: 12" = 1', 3' = 1 yard, 1 yard = 0.9144 meters, 1 mile = 5,280 feet.


Dimension - CORRECT ANSWER - A distance between two points, lines, or planes.



Specifications (SPECS) - CORRECT ANSWER - Documents that define the qualitative
requirements for products, materials, and workmanship upon which the contract for construction
is based


Drawings - CORRECT ANSWER - Graphic illustrations depicting the dimensions, design,
and location of a project. Generally including plans, elevations, details, diagrams, schedules, and
sections.


Addendums - CORRECT ANSWER - A document describing an addition, change,
correction, or modification to contract documents. Issued by the design professional during the
bidding period or prior to the award of contract, and is the primary method of informing bidders
of modifications to the work during the bidding process


Amendment - CORRECT ANSWER - A modification of the contract by a subsequent
agreement. This does NOT change the entire existing contract but does alter the terms of the
affected provisions or requirements


Grade - CORRECT ANSWER - The surface level of the ground



Level - CORRECT ANSWER - A term used to describe any horizontal surface that has all
points at the same elevation and thus does not tilt or slope


Site - CORRECT ANSWER - The location of the project geographically, usually defined
by legal boundaries


Elevation - CORRECT ANSWER - A vertical distance relative to a reference point
£8.61
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MGRADES Stanford University
Follow You need to be logged in order to follow users or courses
Sold
1123
Member since
2 year
Number of followers
104
Documents
68962
Last sold
10 hours ago
MGRADES (Stanford Top Brains)

Welcome to MGRADES Exams, practices and Study materials Just think of me as the plug you will refer to your friends Me and my team will always make sure you get the best value from the exams markets. I offer the best study and exam materials for a wide range of courses and units. Make your study sessions more efficient and effective. Dive in and discover all you need to excel in your academic journey!

3.8

178 reviews

5
76
4
31
3
47
2
9
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions