Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Lean Six Sigma Exam 2024 | Lean Six Sigma Actual Exam 2024 Questions and Correct Answers Rated A+

Rating
-
Sold
-
Pages
73
Grade
A+
Uploaded on
14-11-2024
Written in
2024/2025

Lean Six Sigma Exam 2024 | Lean Six Sigma Actual Exam 2024 Questions and Correct Answers Rated A+

Institution
Lean Six Sigma.
Module
Lean Six Sigma.

Content preview

Lean Six Sigma Exam 2024 | Lean Six
Sigma Actual Exam 2024 Questions and
Correct Answers Rated A+
ToF: Is the basic concepts of Lean are: Just In Time, continuous flow
and waste elimination? -ANSWER-True

ToF: A non-value added activity is on that a customer is willing to pay
for? -ANSWER-False

ToF: By optimizing the time spent of Non-Value Added activities and
eliminating a large proportion of the Non-Value Added (required) Lean
methodologies enable companies to achieve breakthrough results. -
ANSWER-False optimize Value Added Actives

What describes the use of a Product Family Matrix? -ANSWER-
Compares process steps across products and identifies logical
groupings

Lean manufacturing is most concerned with which one of the
following? -ANSWER-Reducing waste

A team is looking at its process from the perspective of the material
flow (from the supplier to customer) and information flow (from
customer to supplier). What Lean technique are they using? -
ANSWER-Value Stream Mapping

Using Lean thinking and principles reduces waste, identifies value
streams, and provides which of the following benefits? -ANSWER-

,Allows the customer to pull product as needed, rather than pushing
product to the customer

In comparing Lean principles to Six Sigma principles, which of these
statements is false?


A Six Sigma principles are problem-focused and stem from the
fundamental belief that process variation is waste
B Six Sigma focuses on improving value streams
C Lean is focused on process flow and views activities that do not add
value as waste
D Lean uses visuals to understand the process flow -ANSWER-B

Who is responsible for providing the organizational structure for
supporting Lean?


A Kaizen Team Leader and team members
B Executive Champion
C Lean Leader
D Deployment Champion -ANSWER-B

Which of the following will enable flow?


A Supervising people
B Implementing a new inventory management system
C Eliminating sources of waste
D Reducing the number of your suppliers -ANSWER-C

,The Cost of Poor Quality is most often calculated during which phase
of the Six Sigma Methodology?


A Improve
B Measure
C Analyze
D Control -ANSWER-B

Judging if a product meets customer requirements is the main
purpose of...


A specification limits.
B warning limits.
C control limits.
D run rule limits. -ANSWER-A

Which term describes measurement of the capability of a process?


A Defects per Million Opportunities (DPMO)
B Critical to Quality (CTQ)
C Just in Time (JIT)
D Design of Experiments (DOE) -ANSWER-A

Which member of the team maintains responsibility over authority and
accountability for the effort? -ANSWER-Executive champion

Storming -ANSWER-In this stage the team leader will help to build self
direction through the resolution of power and authority issues,
decision-making agreements, allowing the team to become more

, independent, using established ground rules to guide team behavior,
establish equal participation opportunities

Norming -ANSWER-A stage in team development where cooperation
is built

A tool that helps turn a large, seemingly overwhelming amount of work
into tasks that are doable, manageable, and measurable is called a...


A WBS (Work Breakdown Structure).
B SIPOC.
C Project Charter.
D SMART. -ANSWER-A

Who is likely to be affected by the outcome of the improvement project
and could be responsible for the final decision on implementing the
proposed solution?


A Team Leader
B Executive Champion
C Stakeholder
D Project Champion -ANSWER-C

The roadmap a team uses to manage and control resources, time and
money to meet improvement objectives is the...


A problem statement.
B goal or AIM statement.
C project charter.

Written for

Institution
Lean Six Sigma.
Module
Lean Six Sigma.

Document information

Uploaded on
November 14, 2024
Number of pages
73
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£14.65
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Tutorhailey Walden University
Follow You need to be logged in order to follow users or courses
Sold
30
Member since
3 year
Number of followers
14
Documents
354
Last sold
7 months ago
The bookstore

Find all past papers and revision material here

4.5

4 reviews

5
2
4
2
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions