100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

SOS NERC PREP.pdf

Rating
-
Sold
-
Pages
101
Grade
A+
Uploaded on
22-10-2024
Written in
2024/2025

Exam of 101 pages for the course HESI EXIT EXAM 2024.docx at HESI EXIT EXAM 2024.docx (SOS NERC PREP.pdf)












Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
October 22, 2024
Number of pages
101
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Content preview

SOS NERC PREP - RELIABILITY EXAM
LATEST 2024 ACTUAL EXAM 200 QUESTIONS
AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+




An 800 MW generator trips in a Balancing Authority
external to your Balancing Authority Area. Which of
the following indications would you expect to see in
your area?

A) Net Actual Interchange would decrease
significantly.

B) ACE would drop to approximately -800 MW.

C) Frequency would drop, and ACE would remain
relatively unchanged.

D) Frequency would drop, and ACE would increase
significantly. - ...ANSWER...C) Frequency would drop,
and ACE would remain relatively unchanged.

,When is the only time voltage reduction for load relief
is acceptable on the transmission system?

A) When voltage on the distribution system is already
low.

B) It is acceptable anytime load relief is needed.

C) When the system is separated from the
Interconnection.

D) When Interconnection frequency is above 60.00 Hz.
- ...ANSWER...C) When the system is separated from
the Interconnection.

In system restoration, priority should be given to:

A) Restoring customer load as quickly as possible.
B) Reporting disturbance to NERC and DOE.
C) Restoring auxiliary power to off-line generators.
D) Restoring power to critical facilities. -
...ANSWER...D) Restoring power to critical facilities.

If a Balancing Authority or Reserve Sharing Group is
experiencing conditions where all available resources
are committed to meet firm load, firm transactions, and
reserve commitments, what does the deficient entity
need to request their Reliability Coordinator to issue?

A) Energy Emergency Alert Level 3

,B) Energy Emergency Alert Level 1
C) Energy Emergency Warning
D) Energy Emergency Alert Level 2 - ...ANSWER...B)
Energy Emergency Alert Level 1

A Transmission Operator's Emergency Operating Plan
states when voltages fall below .87 per unit (p.u.) or
87% of nominal voltage and remains at that level for a
sustained period of 10 minutes or longer, manual load
reduction actions are required. When the system voltage
returns to .9 p.u. or 90% manual load disconnection is
not required.

If a generator trips off line within the BA and the
nearby 230 kV system voltage immediately drops to
200 kV and remains at that level for the next 3 minutes.
What is the BA required to do?

A) Wait 7 minutes for the remaining generator AVRs to
respond; close capacitor banks; adjust Transformer
Taps.

B) Immediately disconnect firm system load until the
voltage returns to at least .9 p.u. Notify the RC of the
amount of load disconnected.

C) Immediately take actions to raise the voltage
EXCEPT removing firm system load. Notify the RC
and neighboring BA's. Prepare for manual load
reduction if the voltage remains below 9 p.u over the

, next 7 minutes - ...ANSWER...C) Immediately take
actions to raise the voltage EXCEPT removing firm
system load. Notify the RC and neighboring BA's.
Prepare for manual load reduction if the voltage
remains below .9 p.u. over the next 7 minutes.

A condition when a Load-Serving Entity has exhausted
all other options and can no longer provide its
customers' expected energy requirements is referred to
as ____________?

A) Energy Emergency
B) Energy deficiency
C) Load shortage
D) Energy shortage - ...ANSWER...A) Energy
Emergency

You are currently in the early stages of restoration with
600 MWs of synchronized generation. There is 200
MWs of spinning reserve available. To maintain
acceptable frequency control, what is the largest block
of load that can be restored at one time?

A) 10 MWs
B) 20 MWs
C) 30 MWs
D) 60 MWs - ...ANSWER...C) 30 MWs

If firm Load shed is imminent or in progress, what level
Energy Emergency Alert is required?
£13.82
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
MBIUKIA

Get to know the seller

Seller avatar
MBIUKIA Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
2
Documents
422
Last sold
2 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions