LEED Green Associate Exam Prep Version B exam 2024-2025
questions and answers
The primary project team member responsible for managing the documentation for a project in
LEED Online is known as the_________?
A. LEED Project Analyst
B. LEED Project Assistant
C. LEED Project Ombudsman
D. LEED Project Administrator - ANSWER>>D
The LEED Scorecard is intended to be used for which of the following purposes? (select 2)
A. Forecasting the organizations energy expenses
B. Assigning project team members specific credit responsibilities
C. Communication of attempted credits to project team
D. Communication of unattempted credits to project team
E. Uploading of supporting documentation - ANSWER>>B, C
Which of the following statements is true regarding the use of the USGBC and LEED logos?
(select 2)
A. The Certification logo may be used when publishing materials announcing project
registration
B. The Certification logo may be used for marketing a project after a project is LEED Certified
C. The USGBC logo may be modified by a member organization to closely match their own
branding
D. The USGBC logo may be used on product packaging to denote that a product can be used to
help a project earn LEED certification
E. The USGBC logo may be used in editorial and marketing materials to signify sponsorship or
when placed adjacent to text that describes the U.S. Green Building Council - ANSWER>>B, E
,Which of the following is not a rapidly renewable material?
A. Wool
B. Teak
C. Bamboo
D. Cork - ANSWER>>B
Which of the following are examples of pre-consumer recycled content products? (select 3)
A. Concrete with fly ash from coal fired power plants
B. Metal studs made from scrapped automobiles
C. Particle board made from old shipping pallets
D. Acoustical wall panel made with byproduct from a plastic bottle manufacturing plant
E. Asphalt paving with reprocessed asphalt removed from old parking lot
F. Insulation made of scrap from denim jean manufacturing - ANSWER>>A, D, F
Increasing access to public transportation provides which of the following benefits?
A. Reduced heat island effect
B. Reduced requirements for bicycle parking
C. Increased demand for road capacity
D. Reduced vehicle uses - ANSWER>>D
In order for a project to receive credit for building/material reuse, all of the following reused or
salvaged materials from an existing building count towards this credit except which of the
following? (choose 2)
A. Floor decking
, B. Hazardous materials
C. Doors
D. Exterior structural brick
E. Window assemblies - ANSWER>>B, E
When a location's soil or groundwater has been identified as contaminated and the local, state,
ornational authority requires its remediation, this is referred to as a __________.
A. Brownfield
B. Greenfield
C. Blackwater
D. Septic area - ANSWER>>A
What types of equipment are Chlorofluorocarbons found in? (select 2)
A. Fire suppression systems
B. Rooftop package HVAC units
C. Chillers
D. Fan coil units
E. Air compressors - ANSWER>>B, C
A project team and stakeholders joined together during a project's pre-design and throughout
the design process to set sustainable building goals for the project and to outline these goals in
the owner's project requirements and basis of design. This is referred to as which one of the
following?
A. Corporate sustainability reporting
B. Commissioning
C. Integrative process
questions and answers
The primary project team member responsible for managing the documentation for a project in
LEED Online is known as the_________?
A. LEED Project Analyst
B. LEED Project Assistant
C. LEED Project Ombudsman
D. LEED Project Administrator - ANSWER>>D
The LEED Scorecard is intended to be used for which of the following purposes? (select 2)
A. Forecasting the organizations energy expenses
B. Assigning project team members specific credit responsibilities
C. Communication of attempted credits to project team
D. Communication of unattempted credits to project team
E. Uploading of supporting documentation - ANSWER>>B, C
Which of the following statements is true regarding the use of the USGBC and LEED logos?
(select 2)
A. The Certification logo may be used when publishing materials announcing project
registration
B. The Certification logo may be used for marketing a project after a project is LEED Certified
C. The USGBC logo may be modified by a member organization to closely match their own
branding
D. The USGBC logo may be used on product packaging to denote that a product can be used to
help a project earn LEED certification
E. The USGBC logo may be used in editorial and marketing materials to signify sponsorship or
when placed adjacent to text that describes the U.S. Green Building Council - ANSWER>>B, E
,Which of the following is not a rapidly renewable material?
A. Wool
B. Teak
C. Bamboo
D. Cork - ANSWER>>B
Which of the following are examples of pre-consumer recycled content products? (select 3)
A. Concrete with fly ash from coal fired power plants
B. Metal studs made from scrapped automobiles
C. Particle board made from old shipping pallets
D. Acoustical wall panel made with byproduct from a plastic bottle manufacturing plant
E. Asphalt paving with reprocessed asphalt removed from old parking lot
F. Insulation made of scrap from denim jean manufacturing - ANSWER>>A, D, F
Increasing access to public transportation provides which of the following benefits?
A. Reduced heat island effect
B. Reduced requirements for bicycle parking
C. Increased demand for road capacity
D. Reduced vehicle uses - ANSWER>>D
In order for a project to receive credit for building/material reuse, all of the following reused or
salvaged materials from an existing building count towards this credit except which of the
following? (choose 2)
A. Floor decking
, B. Hazardous materials
C. Doors
D. Exterior structural brick
E. Window assemblies - ANSWER>>B, E
When a location's soil or groundwater has been identified as contaminated and the local, state,
ornational authority requires its remediation, this is referred to as a __________.
A. Brownfield
B. Greenfield
C. Blackwater
D. Septic area - ANSWER>>A
What types of equipment are Chlorofluorocarbons found in? (select 2)
A. Fire suppression systems
B. Rooftop package HVAC units
C. Chillers
D. Fan coil units
E. Air compressors - ANSWER>>B, C
A project team and stakeholders joined together during a project's pre-design and throughout
the design process to set sustainable building goals for the project and to outline these goals in
the owner's project requirements and basis of design. This is referred to as which one of the
following?
A. Corporate sustainability reporting
B. Commissioning
C. Integrative process