100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

1B Hoisting Prep Questions with complete Solutions

Rating
-
Sold
-
Pages
18
Grade
A+
Uploaded on
01-08-2024
Written in
2024/2025

1B Hoisting Prep Questions with complete Solutions

Institution
Hoisting
Module
Hoisting










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Hoisting
Module
Hoisting

Document information

Uploaded on
August 1, 2024
Number of pages
18
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

1 /181B Hoisting Prep Questions And Answers
1. manufacturer's specification: all hoisting machinery shall be operated in accor- dance with the:
2. inoperable and secure: maintenance repair and refueling shall be done when the machine is:
3. daily: visual inspection shall be made of wire ropes, bearings, gears, friction clutches, brakes, chain drives and other parts subject to wear on all hoisting machinery to ensure against development of unsafe conditions
4. 2: factory of safety. all parts of the crane and supports shall be designed, main- tained, and constructed to withstand all stresses resulting from intended use with a safety factor of not less than:
5. exceed: wind speed must not manufacturer's recommendations for continued work operations.
6. chocked or blocked: when the pile driver is not in use, the 2 /18hammer shall be in the leads or lowered to the ground
7.determine load weight before attempting any lift: the single most important precaution in rigging and hoisting is to:
8.defective components, failure to destroy defective components, using un- safe equipment, hazardous wind conditions, hazardous weather conditions, electrical contact, hoist line not plumb: common hoisting and rigging hazards include:
9.use a shackle: whenever 2 or more rigging ropes or straps are to be placed over a hook
10.A) rig loads to prevent any parts from shifting or dislodging during the lift
B)keep the load under control at all times with taglines
C)never wrap the hoist rope around the load
D)the load line should be brought over the load's center of gravity before the lift is started
E)make sure that everyone stands clear when loads are being lifted, lowered, and freed of slings
**CORRECT ANSWER**
F)all the above: when rigging, lifting and landing loads: 3 /1811.Mass. Dept. of Public Safety within one hour: in the event of death occurring in which hoist equipment is involved, who must be notified
12.more than 500lbs.; higher than 10 feet; bucket can handle more thand 1/4 yard of materials: according to chapter 146 what type of equipment requires a license to operate
13.wheel or track excavating equipment including all 2B & 2C equipment: what type of equipment can your run with a 2A License
£8.45
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ngina112

Get to know the seller

Seller avatar
ngina112 Liberty University
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
18
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions