Pre-Construction Stage - ANS--first
-Assign project team, due diligence, value engineering, permitting
Procurement stage - ANS--second
-Project but-out, subcontracts, purchase orders
Construction stage - ANS--third
-Mobilization, staging, layout, operations
post construction stage - ANS--fourth
-project close out, owners move-in, warranty, project evaluation
design stage - ANS-includes programming and feasibility, schematic design, design
development, and contract documents
Programming and feasibility - ANS-done prior to design and engages the owner to clarify needs
schematic design - ANS-first step of creative process consisting of sketches that identify
preliminary design characteristics
design development - ANS-detail of the work design occurs here. selection of material,
equipment and systems to go into building
contract documents - ANS--final detailed drawings known working drawings and the project
specifications are known as the CD's
-they are the plans that the builder will actually use for construction
Goal of the design team - ANS-make the building compliant with various statutory regulations.
project success relies on compliance with regulations
bidding stage - ANS--plans and specifications are produced for builders
-this stage is coordinated by the architect to assist the owner
pre-construction stage - ANS--stage where the project manager is captain of the construction
team
-one of the hardest stages
On-site and Office support - ANS-The project team is split into which two divisions?