100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CM 1011 Final exam review Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Rating
-
Sold
2
Pages
12
Grade
A+
Uploaded on
26-06-2024
Written in
2023/2024

CM 1011 Final exam review Questions with 100% Actual correct answers | verified | latest update | Graded A+ | Already Passed | Complete Solution

Institution
CM 1011
Module
CM 1011









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
June 26, 2024
Number of pages
12
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CM 1011 Final exam review
3D CAD is the same as BIM. - ANS-False

50% of the D.R. Horton construction team are graduates of the LSU CM department. -
ANS-True

A BIM design begins with intelligent objects such as walls, roof, and windows - ANS-True

A BIM file contains construction details, performance characteristics, and product specs. -
ANS-True

A BIM model cannot perform clash detection before the project does to the field. - ANS-False

A BIM model is a 3D representation of the physical and functional characteristics of a building. -
ANS-True

A BIM model serves as a shared knowledge resource for the entire design and build team. -
ANS-True

A change order adjustment amount does not include general overhead and profit. - ANS-False

A claim can only be made after the project is complete. - ANS-False

A clean site is a safe site. - ANS-True

A clear expression of employee concern should be a policy component of a safety manual. -
ANS-True

A company's managerial commitment should include safety. - ANS-True

A comprehensive quality control plan is the best way to control quality during construction. -
ANS-True

A good win-win example is using recycled concrete as a base material for new roadways or
driveways. - ANS-True

A job hazard analysis focuses on jobs and tasks. - ANS-True

A poor quality design is not a contractor risk. - ANS-False

A project control system utilizes the plans, specs, estimate, and schedule. - ANS-True

, A project debriefing is not meant to be a training mechanism. - ANS-False

A project is considered totally complete even if paperwork has not been delivered to the owner. -
ANS-False

A project may go forward without paperwork. - ANS-False

A public project has less governmental involvement than a private project. - ANS-False

A risk mitigation plan happens before construction starts and does not vary thereafter. -
ANS-False

A safety officer at a company must have authority to take corrective actions if a hazard is
identified. - ANS-True

A stop sign is an example of an administrative control. - ANS-True

A tailgate meeting to review safety procedures is risk management. - ANS-True

A zero-punch list should not be a goal of the project. - ANS-False

According to the Brundtland definition of sustainable development, a sustainable society meets
the needs of the present without compromising the ability of future generations to meet their
own needs. - ANS-True

Adding contingencies may be a pre-bid method to offset a risk. - ANS-True

Additional time should always be asked for when processing a change order. - ANS-True

Administrative activities include permitting, submittals, inspections, and testing. - ANS-True

After quality, safety is the number-one priority when managing construction operations. -
ANS-False

All construction risks have to do with jobsite events. - ANS-False

An activity is a task, function, or decision that has a time commitment, or duration, associated
with it. - ANS-True

An objective of sustainability is to reduce consumption of nonrenewable resources, to minimize
waste, and to create better environments. - ANS-True

An OSHA visit may be caused by an employee complaint. - ANS-True

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DoctorHkane Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
732
Member since
4 year
Number of followers
168
Documents
22458
Last sold
1 day ago

Explore my Stuvia collection for essential study aids: test banks, exams, summaries, and cases. With five years of expertise as an academic writer, I have honed my skills in crafting top-notch essays, exams, and research dissertations. My proficiency lies in producing well-structured and thoroughly researched content that meets academic standards. I am adept at handling various subjects and ensuring a seamless flow of ideas. Whether it's delivering compelling arguments in essays, creating challenging yet fair exam questions, or delving into in-depth research for dissertations, my experience equips me to excel in diverse academic writing tasks. I pride myself on meeting deadlines and maintaining the highest quality in every piece I produce. REACH ON iamnjokikelvin1@gmail

Read more Read less
4.6

386 reviews

5
308
4
29
3
21
2
10
1
18

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions