Pre-construction services include value engineering - ANS-true
a cobstructability review during the pre-construction phase is only about the construction and
economies of the project - ANS-false
pre-construction services include clise-out reports - ANS-false
cobstructability is the predominant reason that owners have opted to use the design-build
delivery method - ANS-true
a feasability study considers how successful rhe project eill be in meeting the owner's intended
purpose for the project - ANS-true
pre-construction services include giving the owner warranty information - ANS-false
BIM coordinationis an example of the typical pre-construction activities - ANS-true
a contractors estimate is the contractors cost to do a project - ANS-true
value engineering can only be done in the design phase if a projects value is to be maximized -
ANS-true
pre-construction services include constructability analysis - ANS-true
after a conceptual estimate is made, the challenge for the designers is to design to the allocated
budget - ANS-true
a constructability review should be done by the project manager and the designer - ANS-false
a complete project team would include material and equipment vendors - ANS-true
the CM-at risk delivery method does not manage risk, generate vakue, or eliminate waste -
ANS-false
pre-construction services should be upfront and involve the owner, designer, and contractor -
ANS-true
conceptual estimating through design process can ensure that the completed design is in line
with the owners budget - ANS-true