100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Field Testing Technician- Grade I (2).

Rating
-
Sold
-
Pages
10
Grade
A+
Uploaded on
23-06-2024
Written in
2023/2024

ACI Concrete Field Testing Technician- Grade I (2).










Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
June 23, 2024
Number of pages
10
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Concrete Field Testing Technician- Grade I
The sensor of the temperature measuring device shall be submerged a minimum of _____ in.
[_____mm] into the freshly mixed concrete. - ANS-3 in. [75 mm]

The temperature measuring device shall have a capacity of measuring temperature of freshly
mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANS-1
degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]

The temperature measuring device shall be calibrated _____, or whenever there is a question of
_____. - ANS-Annually, accuracy

The temperature of concrete may be measured in a wheelbarrow. True or False? - ANS-True

The temperature of concrete may be measured in a wall form. True of False - ANS-True

A composite sample of concrete is required even if the only purpose for obtaining the sample is
to determine temperature. True of False? - ANS-False

What must be done to the sample container prior to sampling the concrete? - ANS-Dampen
(with water)

What must be done to the concrete surrounding the temperature measuring device after the
device is submerged in the fresh concrete. - ANS-Gently press the concrete around the
temperature measuring device at the surface of the concrete

How long must the temperature measuring device remain in the freshly mixed concrete? -
ANS-At least 2 minutes but not more than 5 minutes

After the temperature of the concrete is read, what is required? - ANS-Reporting of temperature

The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - ANS-1
degree F [0.5 C]

According to ASTM C1064, what is one reason to take the temperature of concrete? -
ANS-Verify conformance to a specified requirement for temperature of concrete

A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? -
ANS-False

The sample of concrete used for temperature determination must be rodded 25 times. True or
False? - ANS-False

, Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - ANS-Compliance

This method covers sampling from four types of mixtures which are _____, _____, _____, and
_____. - ANS-Stationary mixers, paving mixers, revolving drum mixers, and open top mixers

The maximum allowable time between obtaining the first and final portions of a composite
sample is _____ minutes. - ANS-15

Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the
sample. True of False? - ANS-True

The maximum elapsed time allowed between obtaining the final portion of the composite
sample and beginning the tests for slump, temperature, and air content is _____ minutes. -
ANS-5

The molding of strength test specimens shall begin within _____ minutes after fabricating the
composite sample. - ANS-15

The concrete sample must be protected from contamination and _____. - ANS-Rapid
evaporation

The minimum size sample for making strength test specimens is _____. - ANS-28 L (1ft^3)

When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly
spaced intervals during discharge of the middle portion of the batch - ANS-2

The composite sample for a paving mixer must represent a minimum of _____ different portions
of the batch of concrete taken from the pile after discharge. - ANS-5

When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of
_____ regularly spaced intervals during discharge of the middle portion of this batch. - ANS-2

Concrete samples from a truck mixer must be obtained before any water or admixtures are
added to the mixer at the job site. True or False? - ANS-False

The composite samples from a truck mixer must be obtained from the _____ portion of the
batch. - ANS-Middle

When the concrete contains aggregate larger than that permitted for a particular test method,
the sample of concrete must be _____ _____ before making the test. - ANS-Wet sieved

The slump test is applicable to plastic concrete with a maximum size aggregate of _____. -
ANS-1.5 in. [37.5 mm]

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO Stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
238
Member since
1 year
Number of followers
2
Documents
10550
Last sold
3 weeks ago

4.8

89 reviews

5
76
4
9
3
3
2
1
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions