100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Certification Practice Exam Questions (1).

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
22-06-2024
Written in
2023/2024

ACI Certification Practice Exam Questions (1).

Content preview

ACI Certification Practice Exam Questions
T/F: The method of determining air content of concrete containing lightweight aggregate is the
pressure method - ANS-False

T/F: When making a test cylinder from concrete being used in construction, the field technician
must also measure the slump of the concrete. - ANS-True

While the technician is checking the slump of the concrete, there is a decided falling away or
shearing off of the concrete from one side of the sample. What should the technician do? -
ANS-Disregard the test and retest on another portion of the sample

Preparation of specimens for transport includes: - ANS-Determination that at least 8 hours has
elapsed since final set

If the aggregate correction factor for a given source of fine and coarse aggregate is found to be
.2% in a pressure air meter, and an air content value of 5% is read on the gage of the same air
meter containing concrete with the same aggregate, what is the correct air content? - ANS-4.8%

Strength test specimens transported from the field to the testing laboratory must be -
ANS-Protected from jarring, Protected from moisture loss, and Protected from freezing

Tests for slump and air content must be started within ____ min after obtaining the final portion
of the composite sample - ANS-5 min

The minimum size for samples to be used for strength tests is - ANS-28L (1 ft^2)

T/F: After strike off of the measure used to determine density, a small quantity of concrete may
be added to correct for a deficiency. - ANS-False

For normal strength concretes, what temperature range must be maintained for test cylinders
during initial curing? - ANS-16 to 27 Celsius (60 to 80 F)

T/F: When the concrete contains large aggregate, the testing technician should wet-sieve the
sample before making density (unit weight) tests for use in yield computations - ANS-False

When determining the temperature of fresh concrete, what is the minimum amount of concrete
cover in all directions around the sensor of the temperature measuring device - ANS-75mm (3in)

T/F: The sides of the slump mold should be lightly tapped to consolidate the concrete in the
mold - ANS-False

Document information

Uploaded on
June 22, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ace360PRO Stuvia
View profile
Follow You need to be logged in order to follow users or courses
Sold
242
Member since
1 year
Number of followers
2
Documents
10541
Last sold
1 week ago

4.8

89 reviews

5
76
4
9
3
3
2
1
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions