100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Building Construction Exam 2 with correct answers 2024

Rating
-
Sold
-
Pages
2
Grade
A+
Uploaded on
01-05-2024
Written in
2023/2024

What is not a type of deep foundation? - answer-spread footing What would be constructed with a flared bottom when used in clay soil to improve its bearing capacity? - answer-belled caisson What pile would have one of the lowest capacity based strength of the material it is made from? - answer-Timber pile What type of portland cement should be used in a concrete mix when the concrete must gain strength as fast as possible so that a contractor can strip forms as soon as possible? - answer-Type 3 What ingredient in a batch of normal weight concrete makes up from 60 to 80% of the volume? - answer-the aggregates What is performed on the jobsite to test the consistency of concrete at the it is delivered? - answer-slump test what type of portland cement is used when a massive concrete element like a mat foundation or a dam wall is being cast and the heat build up within the concrete must be minimized? - answer-Type 4 when a slab is placed and finished, what operation comes immediately after the concrete is screeded? - answer-bull floating when a slab is being placed and finished, screeding is done using what? - answer-a straight edge what is not among the identification marks found on steel reinforcing bars? - answer-weight per lineal foot what is required in order to produce quality concrete? - answer--correct proportioning of the ingredients -adequate mixing - careful placing and consolidating -maintaining adequate moisture for curing what concrete elements would welded wire fabric most likely be used for reinforcing? - answer-floor slabs Which type of joint would be required when a large slab contains so much concrete that it must be poured on two separate days and there is to be no movement allowed between the two separate sections once the concrete has hardened? - answer-construction joint in a high rise building, dead load can be significantly reduced by using lightweight concrete. In what building elements would the architect or engineer often specify the use of lightweight concrete? - answer-floor slabs above grade what is used to place concrete for large slab on grade would be the slowest method and result in the lowest placement rate? - answer-wheelbarrow

Show more Read less
Institution
Building Construction
Module
Building construction








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Building construction
Module
Building construction

Document information

Uploaded on
May 1, 2024
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£6.49
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
njorogeantony870

Also available in package deal

Get to know the seller

Seller avatar
njorogeantony870 Oxford University
Follow You need to be logged in order to follow users or courses
Sold
0
Member since
1 year
Number of followers
0
Documents
85
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions