100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACI Grade 1 Field Testing Certification Practice Test Questions & Answers Solved 100% Correct!!

Rating
-
Sold
1
Pages
9
Grade
A+
Uploaded on
24-04-2024
Written in
2023/2024

For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (True or False) - AnswerFalse The temperature measuring device must be accurate to within 0.1 degrees. (True or False) - AnswerFalse The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of ______ to ______ Fahrenheit ( - AnswerA composite sample is not needed if only the temperature test is being run. (True or False) - Answer-True The temperature of fresh concrete in a placement must be measured by inserting a thermometer into the top six inches of concrete. (True or False) - Answer-False The temperature of the concrete is recorded to the nearest _______ Fahrenheit (______ Celcius). - Answer-2, 0.5 ASTM C1064 states the container used to measure temperature of concrete must be large enough to provided at least 5 inches of concrete around the sensor. (True or False) - AnswerCalibrate the temperature measuring device at least _________, or at least whenever there is a question of accuracy. - Answer-Annually After the thermometer is placed in the concrete: - Answer-Gently press concrete around the thermometer According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer-Verify conformanceIt is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading. (True or False) - AnswerThe maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. (True or False) - AnswerStart molding specimens for strength tests within 30 minutes after fabricating the composite sample. (True or False) - AnswerThe composite concrete sample must be protected from sun, wind, contamination, and rapid evaporation. (True or False) - AnswerIf the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test. (True or False) - AnswerThe composite sample should not be remixed before beginning any tests. (True or False) - AnswerSampling should normally be performed, as the concrete is discharged from the mixer. (True or False) - AnswerASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. (True or False) - AnswerAfter sampling is completed, start the tests for slump and air content within: - AnswerIn any case, do not obtain samples until: - AnswerNo samples shall be taken before _________ or after _________ of the batch has been discharged. - AnswerWhen strength tests are to be made, the minimum size of the composite sample shall be: - AnswerSample the concrete from the chute of a truck mixer by: - AnswerFresh concrete to be tested at the job site should be sampled from: - AnswerThe elapsed time between obtaining the first and final portions of the composite sample, according to ASTM C172, shall not exceed: - AnswerThe sides of the slump cone should be tapped with the mallet to consolidate the concrete in the mold. (True or False) - Answer-False For the slump test, when rodding the second later and the top layer, the tamping rod should just penetrate into the underlying later. (True or False) - Answer-True According to ASTM C143, it is permissible to use a mold, which clamps to a non-absorbent base. (True or False) - Answer-True When filling the final layer of the slump cone, never heap the concrete above the top of the mold. (True or False) - Answer-False The filling of the slump cone should be done in three layers of equal height. (True or False) - Answer-True The slump test may be done on any flat surface. (True or False) - Answer-False When filling the slump cone, each layer should be rodded 25 times. (True or False) - Answer-True The slump cone is filled in three layers of equal volume. (True or False) - Answer-True Concrete should be removed from around the base before the cone is lifted. (True or False) - AnswerTrueThe slump cone should be raised carefully, vertically upward, in a steady motion in _______ seconds - Answer-3 to 7 The elapsed time between the start of filling the slump cone and the removal of the cone must be no more than: - Answer-2 1/2 minutes The slump should be measured to the nearest - Answer-1/4 inch In order to determine slump, you should measure the vertical distance from: - Answer-Top of the mold to the displaced original center of the top surface The dimensions of the slump cone are: - Answer-Top diameter 4 inches, bottom diameter 8 inches, height 12 inches In the slump test, if a decided falling away or shearing off the concrete from one side or portion of the mass occurs upon raising the slump cone, one should: - Answer-Disregard the test and make a new test on another portion of the sample The slump cone should be struck-off with: - Answer-The tamping rod

Show more Read less
Institution
ACI Grade 1 Field Testing Certification
Module
ACI Grade 1 Field Testing Certification









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACI Grade 1 Field Testing Certification
Module
ACI Grade 1 Field Testing Certification

Document information

Uploaded on
April 24, 2024
Number of pages
9
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ACI Grade 1 Field Testing Certification Practice Test Questions For concrete with aggregates less than 3 inches, the thermometer must remain in the fresh concrete sample a minimum of 5 minutes or until the temperature reading stabilizes. (True or False) - Answer -
False The temperature measuring device must be accurate to within 0.1 degrees. (True or False) - Answer -
False The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete throughout a range of ______ to ______ Fahrenheit ( - Answer - A composite sample is not needed if only the temperature test is being run. (True or False) - Answer -True The temperature of fresh concrete in a placement must be measured by inserting a thermometer into the top six inches of concrete. (True or False) - Answer -False The temperature of the concrete is recorded to the nearest _______ Fahrenheit (______ Celcius). - Answer -2, 0.5 ASTM C1064 states the container used to measure temperature of concrete must be large enough to provided at least 5 inches of concrete around the sensor. (True or False) - Answer - Calibrate the temperature measuring device at least _________, or at least whenever there is a question of accuracy. - Answer -Annually After the thermometer is placed in the concrete: - Answer -Gently press concrete around the thermometer According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer -Verify conformance It is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading. (True or False) - Answer - The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. (True or False) - Answer - Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. (True or False) - Answer - The composite concrete sample must be protected from sun, wind, contamination, and rapid evaporation. (True or False) - Answer - If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet -sieved before making the test. (True or False) - Answer - The composite sample should not be remixed before beginning any tests. (True or False) - Answer - Sampling should normally be performed, as the concrete is discharged from the mixer. (True or False) - Answer - ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. (True or False) - Answer - After sampling is completed, start the tests for slump and air content within: - Answer - In any case, do not obtain samples until: - Answer - No samples shall be taken before _________ or after _________ of the batch has been discharged. - Answer - When strength tests are to be made, the minimum size of the composite sample shall be: - Answer -
£6.15
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICMATERIALS City University New York
Follow You need to be logged in order to follow users or courses
Sold
560
Member since
2 year
Number of followers
186
Documents
10590
Last sold
2 hours ago

4.1

94 reviews

5
53
4
11
3
21
2
3
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions