API 653 preparation Exam Questions and Answers 100% Pass
API 653 preparation Exam Questions and Answers 100% Pass Owner API 653 1.2 - Correct Answer ️️ -Overall responsibility for compliance with API 653? Engineer API 653 4.3.1.2 - Correct Answer ️️ -Responsibility - evaluate deterioration of existing shell material? Steel storage tanks built to API 650 and its predecessor API 12c (API 653 1.1.1) - Correct Answer ️️ -What does api 653 cover? Minimum requirements for maintaining the integrity of tanks after they have been placed in service and addresses inspection, repair, alteration, relocation and reconstruction (api 653 1.1.1) - Correct Answer ️️ -What does api 653 provide? Tank foundation, bottom shell, structure, roof, attached appurtenances and nozzles to the face of first flange, first threaded joint or first welding-end connection (api 653 1.1.2) - Correct Answer ️️ -What is the scope of api 653 limited to? API 653 shall govern for tanks that have been placed into service (api 653 1.1.2) - Correct Answer ️️ -In the case of conflict between api 653 and api 650 or it's predecessor api 12c. Which shall govern? Rules or guidelines to cover all the varied conditions which may occur in an existing tank api 653 1.1.5 - Correct Answer ️️ -API 653 does not contain? The regulations shall govern, however if api 653 is more stringent then api 653 shall govern (api 653 1.3) - Correct Answer ️️ -If any provision of api 653 presents a direct or implied conflict with any statutory regulations, which would govern? API 2015, 2016 and api 2217a - Correct Answer ️️ -Where can you find guidelines to safeguard personnel, prevention of fires, explosions and property damage Except in areas specifically designated as safe for hot work, a hot work permit shall be obtained before starting any work that can involve a source of ignition - Correct Answer ️️ -What does api 2009 state in relation to hot work? API 2009 appendix B - Correct Answer ️️ -Where can you find brief information on inerting tanks? Fitness for service - Correct Answer ️️ -API RP 579-1 is? ASNT SNT-TC-1A - Correct Answer ️️ -Personnel qualified and certified in NDE? API RP 2201 - Correct Answer ️️ -Safe hot tapping practices in petroleum industries is? For design and construction of large, welded low pressure storage tanks - Correct Answer ️️ -API standard 620 is? Any work on a tank that changes its physical dimensions or configuration - Correct Answer ️️ -Define an alteration in accordance with api 653? Standard that was in effect at the date of the installation of the component - Correct Answer ️️ -The AS built standard is the? The AS built standard only for those repairs or alterations - Correct Answer ️️ -The standard used for repairs or alterations made after original construction is? 1. Organisation of the jurisdiction where tank is operated 2. Inspection organisation of the licensed and registered insurance company 3. Owner/Operator - Correct Answer ️️ -Name 3 authorised inspection organisations An employee of an authorised inspection agency who is qualified and certified to perform inspections under API 653 - Correct Answer ️️ -Define authorised inspector A change from previous operating conditions involving different properties of the stored product such as, specific gravity or corrosivity and/or different service conditions of temperature and/or pressure - Correct Answer ️️ -What is a change in service The total metal loss, divided by the period of time over which the metal loss occurred - Correct Answer ️️ -Define corrosion rate The portion of the tank bottom or plate within 3" of the inside edge of the shell - Correct Answer ️️ -What is the tank critical zone? A formal, complete inspection as supervised by an authorised inspector of all accessible internal tank surfaces - Correct Answer ️️ -Define internal inspection 1. Installing a shell penetration larger than 12" beneath the liquid level 2. Installing a bottom penetration within 12" of the shell 3. Removing and replacing or adding a shell plate, exceeding 12" dimension 4. Removing or replacing annular ring material, exceeding 12" 5. Installing a new bottom 6. Jacking a tank shell - Correct Answer ️️ -What does a major alteration or repair include
Written for
- Institution
- API 653
- Module
- API 653
Document information
- Uploaded on
- April 20, 2024
- Number of pages
- 58
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
api 653 preparation exam questions and answers 100
Also available in package deal