100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

Construction management exam 1 review questions (Ch. 1-7) already passed

Rating
-
Sold
-
Pages
16
Grade
A+
Uploaded on
02-10-2023
Written in
2023/2024

Construction management exam 1 review questions (Ch. 1-7) already passed What are some concerns of Resident Project Representative or an inspector with respect to his or her project during the construction phase? Main focus: get what was paid for -> construction is done according to drawings/plans/specs/all contract docs What type of organizational structure is best suited for fast-track construction? Design-Build Under a construction management (CM) contract, should the CM firm's responsibilities normally begin at the construction phase, the design phase, the planning phase, or the conceptual phase? Conceptual phase A design-build firm may be (check all that apply): (a) a single firm with both design and construction capability; (b) a joint venture contract between a contractor and a design firm; (c) a design firm that sub-contracts the construction portion to a construction contractor; or (d) a construction contracting firm that subcontractors the design work to an architect or engineer firm. All of the above True or false? Under the Partnering concept, all differences are intended to be resolved at the lowest management level--preferably at the project site. True What types of relationships are intended to be established under a Partnering agreement? Trusting, responsive What are the five steps necessary to set up a Partnering workshop? 1. Creation of a Partnering charter 2. Development of an issue-resolution process 3. Development of a joint evaluation process 4. Discussion of individual roles and concerns 5. Presentation of a facilitated workshop Is Partnering a totally informal process, or should it be addressed in the specifications? Partnering is formal and should be written in specs. True or false? Under the CQC process, inspection is provided by the contractor. True What is the five-step process of initiating a project? 1. Advertise 2. Bid opening 3. Award contract 4. Sign contract 5. Notice to proceed Explain the one-to-one concept People on equal levels from different organizations communicate with each other. What is the principal barrier to the use of design-build contracts on public works projects? Laws (such as Brooks Law, Wicks Law, etc.) What is apparent authority? Assumed or implied authority. Opposite of expressed in writing Give an example of delegated authority Resident project engineer gets shop drawings from contractor What are the dangers of allowing the inspector to supervise the work? Responsibility shifts to resident project representative when it should be the responsibility of contractor When should materials be checked by the inspector? Upon arrival at the job site How much authority should be allowed to the Resident Project Representative or inspector--should he or she be permitted to approve Change Orders affecting time or cost? Inspector can't approve change orders Is it permissible for the owner's representative to issue instructions or orders to a subcontractor as long as they are directed to a management representative of that subcontractor? Inspector only talks to contractor, not subcontractor Who should have the sole authority to stop the work? Only person that can stop work is the owner Which of the following is an acceptable practice by the Resident Project Representative or the inspector? (a) To control the work (b) To supervise the work (c) To have the right to stop the work (d) None of the above practices is acceptable d True or false? If requested by the contractor, the Resident Project Representative or inspector may offer suggestions as to how to do the work. False True or false? If an inspector discovers that the work of a subcontractor is deficient, he or she should direct the subcontractor to make the necessary corrections, then tell the General Contractor what was done. False; The inspector should tell the general contractor to tell the subcontractor What are the three types of authority exercised in a construction contract? Apparent, expressed (written), limited It is a well-known principle that the engineer should not tell the contractor how to do the work; but, if the engineer observes that the contractor's construction methods appear to be unable to meet the specifications, what should the engineer do? Document it; send formal correspondence to someone and write in daily report Evaluation of the contractor's schedule submittal should be limited to what three principal concerns? Major milestones, when is notice to proceed date, and notice of substantial completion Why is it desirable to prepare an inspection plan prior to construction? So you know what date to schedule inspections for What basic equipment (not furnishings) should be required

Show more Read less
Institution
Construction Management
Module
Construction management










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Construction management
Module
Construction management

Document information

Uploaded on
October 2, 2023
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£8.06
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached


Also available in package deal

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StellarScores Western Governers University
Follow You need to be logged in order to follow users or courses
Sold
1907
Member since
2 year
Number of followers
864
Documents
21100
Last sold
2 days ago
Your Academic Hub: Documents, Study Guides, Summaries, Essays, and Exclusive Package Deals.

Welcome to my comprehensive academic resource store! At my online hub, I offer a vast array of meticulously crafted documents, study guides, summaries, and essays to support your educational journey. I understand the value of accuracy and completeness, which is why all my materials are verified and kept up-to-date with the latest versions. But that's not all! I also offer exclusive package deals and bundles to provide you with cost-effective solutions for your academic needs. Whether you're a student looking for study aids or seeking in-depth knowledge, my store is your one-stop destination for reliable, top-quality materials that can propel your learning experience to new heights. Explore my offerings and unlock the keys to academic success today!

Read more Read less
4.0

439 reviews

5
238
4
78
3
61
2
24
1
38

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions