MNO2604 ASSIGNMENT 05 DUE 29 SEPTEMBER 2023
Started on Friday, 22 September 2023, 2:51 PM
State Finished
Completed on Wednesday, 27 September 2023, 6:29 PM
Time taken 6 days
Marks 10.00/10.00
Grade 100.00 out of 100.00
Question 1
Question text
Work measurement: Time study:
The following table shows the observation times and ratings of a time study that was
conducted at your workplace. A contingency allowance of 5% is applicable.
For the task below, complete the table below by calculating the following:
- The Basic time.
- The Selected Basic time
- The Actual time and
- The Standard time.
Then answer questions 1, 2 and 3 which are related to this
calculation:
Element Observed Basic Selected Rest Actual
number time Frequency basic time allowance time
Rating time
1 1.28 85 1/1 10
2 1.44 70 1/1 11
3 1.36 80 1/1 10
4 1.25 90 1/1 12
Total actual time:
Contingency allowance: 5%
Standard time:
Which one of the following is the Total Actual time?
1. 47.9
2. 4.79
3. 50.3
4. 5.03
, 1. 47.9
2. 4.79
3. 50.3
4. 5.03
Clear my choice
Question 2
Question text
Work measurement: Time study:
The following table shows the observation times and ratings of a time study that was
conducted at your workplace. A contingency allowance of 5% is applicable.
For the task below, complete the table below by calculating the following:
- The Basic time.
- The Selected Basic time
- The Actual time and
- The Standard time.
Then answer questions 1, 2 and 3 which are related to this
calculation:
Element Observed Basic Selected Rest Actual
number time basic time allowance time
Rating time Frequency
1 1.28 85 1/1 10
2 1.44 70 1/1 11
3 1.36 80 1/1 10
4 1.25 90 1/1 12
Total actual time:
Contingency allowance: 5%
Standard time:
Which one of the following is the value of the Contingency allowance?
1. 0.22
2. 0.23
3. 0.24
4. 0.25
1. 0.22
2. 0.23
Started on Friday, 22 September 2023, 2:51 PM
State Finished
Completed on Wednesday, 27 September 2023, 6:29 PM
Time taken 6 days
Marks 10.00/10.00
Grade 100.00 out of 100.00
Question 1
Question text
Work measurement: Time study:
The following table shows the observation times and ratings of a time study that was
conducted at your workplace. A contingency allowance of 5% is applicable.
For the task below, complete the table below by calculating the following:
- The Basic time.
- The Selected Basic time
- The Actual time and
- The Standard time.
Then answer questions 1, 2 and 3 which are related to this
calculation:
Element Observed Basic Selected Rest Actual
number time Frequency basic time allowance time
Rating time
1 1.28 85 1/1 10
2 1.44 70 1/1 11
3 1.36 80 1/1 10
4 1.25 90 1/1 12
Total actual time:
Contingency allowance: 5%
Standard time:
Which one of the following is the Total Actual time?
1. 47.9
2. 4.79
3. 50.3
4. 5.03
, 1. 47.9
2. 4.79
3. 50.3
4. 5.03
Clear my choice
Question 2
Question text
Work measurement: Time study:
The following table shows the observation times and ratings of a time study that was
conducted at your workplace. A contingency allowance of 5% is applicable.
For the task below, complete the table below by calculating the following:
- The Basic time.
- The Selected Basic time
- The Actual time and
- The Standard time.
Then answer questions 1, 2 and 3 which are related to this
calculation:
Element Observed Basic Selected Rest Actual
number time basic time allowance time
Rating time Frequency
1 1.28 85 1/1 10
2 1.44 70 1/1 11
3 1.36 80 1/1 10
4 1.25 90 1/1 12
Total actual time:
Contingency allowance: 5%
Standard time:
Which one of the following is the value of the Contingency allowance?
1. 0.22
2. 0.23
3. 0.24
4. 0.25
1. 0.22
2. 0.23