Construction Management Study Guide-Review Questions with correct answers
What two major components make up the contract documents? Correct Answer-Plans --> drawings Specs --> project manual When did architects first use their drawings to communicate design intent? Correct Answer-They built models and drew sketches to help explain to the builders what they wanted done. What does CAD stand for? Correct Answer-Computer Aided Design Typical drawing order in set of plans? Correct Answer-Civil, Architectural, Structural, Mechanical, Electrical Whats the difference between a plan view and a sectional view in a set of drawings? Correct Answer-The difference between the two is that the plan view is a birds-eye view of a horizontal section of the building, while the sectional view is a vertical cut in the side of the building. Name the four primary sections of the project manual? Correct Answer-Bidding documents General conditions Supplemental conditions Technical specifications 2004 CSI MasterFormat is divided into how man
Written for
- Institution
- Construction Management
- Module
- Construction Management
Document information
- Uploaded on
- September 28, 2023
- Number of pages
- 18
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
construction management study guide review questio
Also available in package deal