PSPO I Questions and Answers Graded A
PSPO I Questions and Answers Graded A The Product Backlog is ordered by : Importance, where the most important items are at the top of all items. The term « pigs » is used to refer to which of the following roles in a Scrum project? The team Which two are properties of the Daily Scrum? It is fifteen minutes or less in duration. Its location and time should remain constant A key measure of success for the Product Owner to track is the development team's velocity. FALSE Select the two focus areas that are not considered in executing Value Driven Development by the Product Owner. Coach of the Development Team in self-organization and cross-functionality Remover of impediments to the Development Team's progress What is the Sprint Backlog? The Product Backlog items selected for this Sprint plus the plan for delivering them Product Backlog Items should always be expressed as User Stories. FALSE Everyone must stand up at the Daily Scrum. FALSE The Scrum Master's job is to work with the Scrum Team and the organization to increase the awareness of the artifacts. Which pillar of Scrum does this represent ? Transparency Scrum is a container for other techniques and methodologies. TRUE Who is allowed to change the Sprint Backlog during the Sprint ? The Development Team When was Scrum first introduced? In 1995 at a conference presentation After a series of additions and removals of features by the Product Owner, how can you determine on the release burndown bar chart if the total work in the project is more than initially planned? Bottom of the bar stays below horizontal axis What does Product Backlog management include? 1) Clearly expressing Product Backlog items; Ordering the items in the Product Backlog to best achieve goals and missions; 2) Optimizing the value of the work the Development Team performs
Written for
- Institution
- PSPO I
- Module
- PSPO I
Document information
- Uploaded on
- September 24, 2023
- Number of pages
- 34
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
pspo i questions and answers graded a
Also available in package deal