answers, 100% Accurate. Graded A+
Exceptional Experience - ✔✔-Blend of content, technology and emvironment.
Allied Industries - ✔✔-Mep arch and structural
Program phase - ✔✔-Sales process - what the customer wants to accomplish
Design phase - ✔✔-Taking program and create a detailed design and schedule.
Install Phase - ✔✔-Install, documentation, labeling and adjusting
Verify and support Phase - ✔✔-Install complete, commissioning, training, support
JTA - ✔✔-Job, Task, Analysis broken down by CTS - duties and tasks defined: project phases prog design
install support and sub tasks (umbrellas)
Needs analysis - ✔✔-End user needs, applications, tasks
ADM - ✔✔-analytical decision making
BDM - ✔✔-basic decision making
visual acuity - ✔✔-the ability to see fine detail 5minutes of arc
Basic decision making BDM - ✔✔-200 BDM acuity factor
, contrast ratio for BDM - ✔✔-15:1 a group of pixels
ADM required drawings 3438 acuity factor - ✔✔-plan view and elevation
16:9 aspect ratio - ✔✔-9 divided by 16 or 1.78
Analytical Decision Making ADM - ✔✔-50:1 based on pixel
full motion video contrast ratio - ✔✔-80:1
4:3 aspect ratio - ✔✔-4 divided by 3 or 1.33
ratio for diagonal - ✔✔-18.36
3% x acuity factor 200 - ✔✔-find
EH/IH=Element Height - ✔✔-% element height
Element Height - ✔✔-EH=Fv/AF (200) see 3.page 69
farthest viewer calculation - ✔✔-FV = 200xEH
ADM - ✔✔-FV= IH/IR x UHD or 3438
ADM acuity factor - ✔✔-3438
SPL Meter - ✔✔-Measures SPL target is same level to all ears +/-3db