100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.

Rating
5.0
(1)
Sold
22
Pages
14
Grade
A+
Uploaded on
13-06-2023
Written in
2022/2023

DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.VDBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.DBIA EXAM 2 STUDY GUIDE PRACTICE QUESTIONS AND ANSWERS 100% VERIFIED.

Show more Read less
Institution
DBIA
Module
DBIA









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
DBIA
Module
DBIA

Document information

Uploaded on
June 13, 2023
Number of pages
14
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

DBIA EXAM 2 STUDY GUIDE PRACTICE
QUESTIONS AND ANSWERS
_____ _____ is the belief that there is a technique, method or process that is more
effective at delivering a particular outcome than any other Correct -Best Practice

A Best Practice is the belief that there is a ______ , _____ or _____ that is more
effective at delivering a particular outcome than any other. Correct -- technique
- method
- process

How many best practices are there? Correct -10

What are the 3 areas that the implementing techniques are categorized into? Correct
-1. Procurement
2. Contracting
3. Execution

All DB members should be _____ and _____ in the DB process and be knowledgeable
of the differences between DB and other delivery systems. Correct -- educated
- trained

_____ is the essence of Design-Build Done Right Correct -Teaming

What are the 4 key factors enabling Team Alignment? Correct -1. Early Involvement
2. Qualifications-Based Selection
3. Cost Transparency
4. Fostering an Environment of Trust

The most successful projects engage core team members in the _____ process, before
advancing beyond _____ design. Correct -- design
- schematic

Early involvement enables deeper participation in _____ practices. Correct -
integrated

Projects should be staffed with individuals that are _____ and ______ in the
implementation of DB best practice and whose _______ are well-suited to the
collaborative nature of the DB process Correct -- educated
- experienced
- personalities

Senior leadership must support DB project _____. Correct -delivery

, _____ should create an organization that supports the successful procurement and
execution of a DB project with key personnel _____ and _____ in DB project delivery in
an _____ and _____ environment. Correct -- Owners
- educated
- trained
- integrated
- collaborative

Executive leadership requires _____ _____. Correct -True Believers

_____ are responsible for an integrated and collaborative environment. Correct -
Owners

Owners are responsible for an _____ and ______ environment. Correct -- integrated
- collaborative

Owners must sustain an atmosphere of _____ and _____. Correct -- trust
- flexibility

Owners must consistently operate from an _____ DB mindset. Correct -integrated

_____ _____ has a unique definition for each project. Correct -Design Excellence

_____ and _____ should collaboratively and jointly define the design value that best
meet Owner's goals for each project. Correct -- Owners
- Design-Builders

Owners and Design-Builders should collaboratively and jointly define the _____ _____
that best meet Owner's goals for each project. Correct -Design Value

_____ _____ is the time from Notice of Award to the end of the warranty period.
Correct -Post Award

Post Award is the time from _____ __ _____ to the end of the _____ period. Correct
-- Notice of Award
- Warranty

_____ Management typically focuses on building the project. Correct -Construction

_____-_____ _____ involves managing people through the ENTIRE process.
Correct -Design-Build Leadership

What are the 5 main stages of DB Leadership? Correct -1. Project team formation
and alignment.
2. Project pursuit and procurement.
3. Design integration and advancement.

Reviews from verified buyers

Showing all reviews
1 year ago

1 year ago

Thank you for the positive feedback.

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
saraciousstuvia WALDEN UNIVERSITY
Follow You need to be logged in order to follow users or courses
Sold
556
Member since
3 year
Number of followers
380
Documents
11349
Last sold
3 days ago
BRIGHTEST IDEAS EDUCATIONAL WORLD

Welcome to the best educational world with the brightest,amazing and all complete study materials. I wish you great,easy learning and success through out your course. Kindly message me if you cant find your tutorials

4.0

114 reviews

5
61
4
20
3
17
2
3
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions