Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Summary

Summary Material Handling and Plant Layout Revision Poster

Rating
-
Sold
-
Pages
4
Uploaded on
22-10-2022
Written in
2015/2016

Material Handling and Plant Layout Revision Poster for ME20026 Manufacturing operations and technology

Content preview

ME20026: MATERIAL HANDLING AND PLANT LAYOUT:
FLOW OF MATERIALS:
GOALS IN MATERIAL HANDLING:
 Minimisation of handling in design, renovation, or expansion of a
manufacturing system
 Enhance safety and working conditions throughout material handling
planning



DESIGN CONDITIONS IN MATERIAL HANDLING:

Category Measures
Physical state Solid, liquid, gas
Size Volume, length, width, height
Weight Per piece, per unit volume
Shape Long and flat, round, square etc
Condition Hot, cold, wet, under pressure etc
Safety risk Explosive, flammable, toxic, fragile etc




EFFECTIVENESS MEASURES:

Total Material Flow: Material Handling Labour Ratio: Labour Handling Cost: Equipment Utilisation:
 Lower value is better  Lower value is better  Lower value is better  Higher value is better
 Simplest measure  Indication of how much work  Represents cost  Used to gauge Summary of Effectiveness Measures:
 Measure used to compare needs to be done to handle resulting from time effectiveness of material
different variations of routes material spent by staff on handling Effectiveness measure Best value
when planning material  Measure is useful when staff material handling Total material flow Lower value
Material handling labour Lower value
handling using the same have dedicated material  Useful when staff have actual output of rate
transportation equipment handling roles different roles
manufacturing system Labour handling cost Lower value
mass of material number of personnel workingtimethat is spent on theoretical output of Equipment utilisation Higher value

being transported ∈factory ×distance transported
on material handling material handling manufacturing system
total number of personnel total working time

Document information

Uploaded on
October 22, 2022
Number of pages
4
Written in
2015/2016
Type
SUMMARY

Subjects

£7.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
zarazaman1

Also available in package deal

Thumbnail
Package deal
ME20026 Manufacturing Operations and Technology
-
9 2022
£ 15.99 More info

Get to know the seller

Seller avatar
zarazaman1 University of Bath
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
3 year
Number of followers
1
Documents
11
Last sold
2 year ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions