100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Presentation

INF3708_ASSIGNMENT_02_2022_S2_correctSoftware Project Management

Rating
-
Sold
-
Pages
5
Uploaded on
31-01-2022
Written in
2021/2022

QUESTION 1 [30 Marks] QUESTION ON CHAPTER 5 1.1 Discuss the software efforts estimation techniques according to your prescribe textbook by Hughes and Cotterell (2009). In addition, fine at least one journal article that discussed software project estimation techniques/project estimation techniques and summary the techniques discussed in the article. Please remember to include the title of the article your reviewed. (20) 1.2. COCOMO is a cost estimation model that was built around equation. Provide the equation and describe the variables in Boehm’s equation for calculating effort in the use of the COCOMO model. (3) 1.3. Three systems with the following estimated lines of code were identified. Using Boehm’s equation, calculations and identify which year each system will be completed. Which system can be completed in three years? N: B show all your calculations. (7) System Line of code System type A 17862 Semi-detached mode B 10762 Semi-detached mode C 22132 Organic mode Table 1 for Question 1: System details COCOM Constants for calculation are made available in table 5.4 of your textbook, page 121.

Show more Read less









Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
January 31, 2022
Number of pages
5
Written in
2021/2022
Type
Presentation
Person
Unknown

Subjects

Content preview

Software Project Management

INF3708
Assignment 02: Due date 20 September 2019 Compulsory

ASSIGNMENT 02 - SEMESTER 2

Total Mark: 133 Marks = 100%

Mark weight: 60%

ASSIGNMENT 02
Due date 20 September 2019
Study material Hughes & Cotterell: Chapters 5 - 9
Total marks 133 marks
If your assignment is late, please DO NOT PHONE OR E-MAIL asking for an extension but include a note in
your assignment stating the reason for the late submission and we will decide whether or not it will be
marked.




Instructions:

1. Download and complete this assignment and submit online in a .pdf format by performing the calculations.

2. The following unique number has to be assigned to the assignment:

UNIQUE NUMBER:
758039

3. Show all your working (calculations).




This study source was downloaded by 100000835818796 from CourseHero.com on 01-31-2022 09:27:36 GMT -06:00


https://www.coursehero.com/file/44887039/INF3708-ASSIGNMENT-02-2019-S2-correctpdf/

, Questions on Chapter 5 - 7



QUESTION 1 [30 Marks]

QUESTION ON CHAPTER 5

1.1 Discuss the software efforts estimation techniques according to your prescribe textbook by Hughes
and Cotterell (2009). In addition, fine at least one journal article that discussed software project estimation
techniques/project estimation techniques and summary the techniques discussed in the article. Please
remember to include the title of the article your reviewed.
(20)

1.2. COCOMO is a cost estimation model that was built around equation. Provide the equation and
describe the variables in Boehm’s equation for calculating effort in the use of the COCOMO model.
(3)

1.3. Three systems with the following estimated lines of code were identified. Using Boehm’s
equation, calculations and identify which year each system will be completed. Which system can be
completed in three years? N:B show all your calculations. (7)

System Line of code System type

A 17862 Semi-detached mode
B 10762 Semi-detached mode
C 22132 Organic mode
Table 1 for Question 1: System details

COCOM Constants for calculation are made available in table 5.4 of your textbook, page
121.



QUESTION 2 [24 Marks]

QUESTIONS ON CHAPTER 6


2.1 Consider the following list of tasks with dependencies and estimated durations reflected
in table 2 and draw a CPD network diagram activity-on-node diagram to illustrate the
interaction of the activities. Include the calculations of all the values on the nodes forward
pass (earliest date) and backward pass (latest date). Note: please use the notation
example in your textbook. (14)




Activity Duration Predecessor

A 4 day -
B 2 days A
C 3 days A
D 2 days C
E
This study source was downloaded by 100000835818796 from5 days
CourseHero.com on B09:27:36 GMT -06:00
01-31-2022
F 7 days E
https://www.coursehero.com/file/44887039/INF3708-ASSIGNMENT-02-2019-S2-correctpdf/
£7.09
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Allanswers34
1.0
(1)

Get to know the seller

Seller avatar
Allanswers34 University of Bristol
View profile
Follow You need to be logged in order to follow users or courses
Sold
3
Member since
3 year
Number of followers
3
Documents
50
Last sold
3 year ago

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions