What does CP mean and indicate a few examples of providers (5 listed). -
CORRECT ANSWER-Commissioning Provider;
1.) Independent third-party commissioning firm
2.) A/E firm
3.) General contractor
4.) Construction manager
5.) Owner's personnel
What is retro-commissioning (RetroCx)? - CORRECT ANSWER-Commissioning
an existing building that has never been commissioned.
What is re-commissioning (ReCx)? - CORRECT ANSWER-Commissioning a
building that has been previously commissioned.
What is continuous commissioning (CCx)? - CORRECT ANSWER-Owner
continues to collect and compare baseline data on selected building systems to
ensure that the building functions optimally throughout its operating life.
,What is total building commissioning (TBCx)? - CORRECT ANSWER-
Commissioning NOT only for the mechanical & HVAC systems, or any single
system. TBCx - Commission the entire building.
What are the five phases of commissioning? - CORRECT ANSWER-1.) Pre-
Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance
Studies indicate _ to _% savings in building operating costs when comparing a
comissioned building to a non-commissioned building. - CORRECT ANSWER-8
to 20%
What is commissioning? - CORRECT ANSWER-A process of documentation,
adjustment, testing, verification, and training performed specifically to ensure
that the finished facility operates in accordance with the owner's documented
project requirements and the construction documents. Commissioning serves the
owner's best interests by delivering a facility with systems that perform as
specified, intended, and paid for.
, What does DID mean and provide a brief definition? - CORRECT ANSWER-
Design Intent Document - Details functional requirements and Owner's
expectations of how a building will be used and operated - Owner's Project
Requirements
What does BOD mean and provide a brief definition? - CORRECT ANSWER-
Basis of Design - The concepts, calculations, decisions, and product selections
used to meet the Owner's Project Requirements.
Designer's (A/E) services typically (do or do not) include field verification that
their design works as intended. - CORRECT ANSWER-Do NOT
Construction Manager's services typically (do or do not) include functional
verification that the installed systems meet design intent. - CORRECT
ANSWER-Do NOT
The CxA has a distinct responsibility to who? - CORRECT ANSWER-The Owner
The CxA is not just another layer of inspection, but a catalyst for? - CORRECT
ANSWER-Communication that makes quality solutions possible.
and CORRECT DETAILED ANSWERS ALREADY GRADED
A+
What does CP mean and indicate a few examples of providers (5 listed). -
CORRECT ANSWER-Commissioning Provider;
1.) Independent third-party commissioning firm
2.) A/E firm
3.) General contractor
4.) Construction manager
5.) Owner's personnel
What is retro-commissioning (RetroCx)? - CORRECT ANSWER-Commissioning
an existing building that has never been commissioned.
What is re-commissioning (ReCx)? - CORRECT ANSWER-Commissioning a
building that has been previously commissioned.
What is continuous commissioning (CCx)? - CORRECT ANSWER-Owner
continues to collect and compare baseline data on selected building systems to
ensure that the building functions optimally throughout its operating life.
,What is total building commissioning (TBCx)? - CORRECT ANSWER-
Commissioning NOT only for the mechanical & HVAC systems, or any single
system. TBCx - Commission the entire building.
What are the five phases of commissioning? - CORRECT ANSWER-1.) Pre-
Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance
Studies indicate _ to _% savings in building operating costs when comparing a
comissioned building to a non-commissioned building. - CORRECT ANSWER-8
to 20%
What is commissioning? - CORRECT ANSWER-A process of documentation,
adjustment, testing, verification, and training performed specifically to ensure
that the finished facility operates in accordance with the owner's documented
project requirements and the construction documents. Commissioning serves the
owner's best interests by delivering a facility with systems that perform as
specified, intended, and paid for.
, What does DID mean and provide a brief definition? - CORRECT ANSWER-
Design Intent Document - Details functional requirements and Owner's
expectations of how a building will be used and operated - Owner's Project
Requirements
What does BOD mean and provide a brief definition? - CORRECT ANSWER-
Basis of Design - The concepts, calculations, decisions, and product selections
used to meet the Owner's Project Requirements.
Designer's (A/E) services typically (do or do not) include field verification that
their design works as intended. - CORRECT ANSWER-Do NOT
Construction Manager's services typically (do or do not) include functional
verification that the installed systems meet design intent. - CORRECT
ANSWER-Do NOT
The CxA has a distinct responsibility to who? - CORRECT ANSWER-The Owner
The CxA is not just another layer of inspection, but a catalyst for? - CORRECT
ANSWER-Communication that makes quality solutions possible.