What are the five phases of commissioning? - ANSWER-1.) Pre-
Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance
What does the acronym LEED stand for? - ANSWER-Leadership
in Energy and
Environmental Design, USGBC trademarked "Green Building
Rating System"
What does the acronym RTF stand for? - ANSWER-Resolution
tracking form
What does the acronym SVC stand for? - ANSWER-System
verification check
,What does the acronym TBE stand for? - ANSWER-Test and
balance engineer
What does the acronym USGBC stand for? - ANSWER-United
States Green
Building
Council
Who works directly for the owner and is independent of
designers, contractors, vendors, and suppliers on the project?
- ANSWER-The commissioning authority
What phase does comprehensive HVAC commissioning start? -
ANSWER-Pre-
design
phase
What phase does construction HVAC commissioning
start? - ANSWER-
Construction
phase
What are the benefits of a preventive maintenance program
(PM) (6 total)? - ANSWER-1.) Maintains efficiency
2.) Keeps systems clean
3.) Accurate control
4.) Reduce equipment failure
5.) Extends equipment life
6.) Provides good record keeping
, Most commissioning benefits continue for how long? -
ANSWER-The life of the
building
What is an RFQ and what does it do? - ANSWER-Request for
qualifications; when a client asks for details concerning
previous relevant commissioning experience. It narrows the list
of commissioning providers that receive a RFP.
What is an RFP and what does it do? - ANSWER-Request for
proposal; provides a greater characterization of Cx services. It
should include as much information about the project as
possible, and usually provides details of schematic design for
the systems to be commissioned.
What is the heart of the commissioning process? -
ANSWER-Functional
performance
testing
Equipment operation during FPTs is performed by
who? - ANSWER-
Appropriate contractor or equipment
manufacturer
Who is responsible for directing, witnessing, and
documenting the functional