Section 1: Slump Test (ASTM C143)
,Question 1 – Slump Test: Equipment
What is the required diameter of the base of the slump cone?
A) 4 in. (100 mm)
B) 6 in. (150 mm)
C) 8 in. (200 mm)
D) 10 in. (250 mm)
Correct Answer: C
Rationale: The slump cone has a base diameter of 8 inches (200 mm) and
a top diameter of 4 inches (100 mm), which is essential for maintaining
standard proportions during the test.
Question 2 – Slump Test: Rodding
How many strokes of the tamping rod are required for each of the three
layers when filling the slump cone?
A) 15 strokes per layer
B) 20 strokes per layer
C) 25 strokes per layer
D) 30 strokes per layer
Correct Answer: C
Rationale: The standard requires 25 strokes of the rod for each of the
three layers to ensure proper consolidation of the concrete sample.
,Question 3 – Slump Test: Filling
What is the proper depth of each layer when filling the slump cone?
A) One-third of the cone volume by visual estimation
B) Equal volumes, approximately one-third of the cone height
C) Approximately 2 inches for each layer
D) Fill to the top of the cone, then rod
Correct Answer: B
Rationale: Each layer should be approximately one-third of the cone
height to ensure uniform compaction and representative testing
throughout the sample.
Question 4 – Slump Test: Lifting
What is the maximum time allowed for lifting the slump cone from the
concrete?
A) 2 to 5 seconds
B) 5 to 10 seconds
C) 10 to 15 seconds
D) 15 to 20 seconds
Correct Answer: B
, Rationale: The cone must be lifted vertically in 5 to 10 seconds to
minimize disturbance to the concrete and ensure accurate slump
measurement.
Question 5 – Slump Test: Measurement
How is the slump measured after the cone is removed?
A) Measure the vertical distance from the top of the cone to the displaced
original center of the top surface
B) Measure the horizontal spread of the concrete
C) Measure the height of the concrete at its highest point
D) Measure the distance from the base to the lowest point of the concrete
Correct Answer: A
Rationale: The slump is measured as the vertical drop of the concrete
from the original height of the cone, specifically at the center of the top
surface.
Question 6 – Slump Test: Time Limit
What is the maximum allowable time from the start of sampling to
completion of the slump test?
A) 2.5 minutes
B) 5 minutes
C) 10 minutes
D) 15 minutes