Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Kaplan PE (Professional Engineering) Exam Comprehensive Question Multiple Choice Practice Bank for Professional Engineering Licensure

Rating
-
Sold
-
Pages
123
Grade
A+
Uploaded on
16-07-2026
Written in
2025/2026

Kaplan PE (Professional Engineering) Exam Comprehensive Question Multiple Choice Practice Bank for Professional Engineering Licensure

Institution
3x@m
Module
3x@m

Content preview

1



Kaplan PE (Professional Engineering)
Exam Comprehensive Question Multiple-
Choice Practice Bank for Professional
Engineering Licensure

Exam Topic: Kaplan PE (Professional Engineering) Examination – Comprehensive Practice for
NCEES PE Civil, Electrical, Mechanical, Environmental, and Chemical Engineering Disciplines




SECTION 1: CIVIL ENGINEERING – BREADTH & DEPTH (Questions 1–50)


Subsection 1.1: Project Planning & Means and Methods (1–10)


1. A construction project requires excavation for a basement 20 ft deep in a soil with an angle of


repose of 35° and a unit weight of 120 pcf. What is the minimum horizontal distance from the


excavation edge to the start of the slope if no shoring is used?


A) 14.3 ft


B) 20.0 ft


C) 28.6 ft


D) 34.3 ft


CorreCt Answer: C) 28.6 ft

, 2


Rationale: For an unsupported slope, the horizontal distance equals depth divided by the


tangent of the angle of repose. tan(35°) = 0.700, so horizontal distance = 20 ft / 0.700 = 28.6 ft.


This represents the minimum setback required for stability per OSHA soil mechanics principles.




2. A contractor is planning to use a crawler crane with a 150-ft boom at a 60° angle to lift a


precast concrete beam weighing 28,000 lb. The crane capacity chart indicates a rated capacity


of 35,000 lb at this configuration. What is the load factor (percentage of rated capacity being


used)?


A) 62%


B) 72%


C) 80%


D) 88%


CorreCt Answer: C) 80%


Rationale: Load factor = (Actual Load / Rated Capacity) × 100 = (28,,000) × 100 = 80%.


This is within the typical 85% safe working load limit for most crane operations.

, 3


3. Which of the following soil types would require the largest slope angle (steepest cut) to


maintain stability in an excavation?


A) Soft clay


B) Loose sand


C) Dense gravel


D) Stiff clay


CorreCt Answer: D) Stiff clay


Rationale: Stiff clay has higher shear strength and cohesion, allowing steeper slopes. Soft clay


and loose sand have lower shear strengths requiring flatter slopes. Dense gravel, while strong,


still requires a flatter slope than stiff clay due to its granular nature.




4. A project schedule uses the critical path method (CPM). Activity A has an early start of day 5,


a duration of 6 days, and a late finish of day 14. What is the total float for Activity A?


A) 0 days


B) 2 days

, 4


C) 3 days


D) 6 days


CorreCt Answer: C) 3 days


Rationale: Total float = Late Finish - Early Finish. Early Finish = Early Start + Duration - 1 = 5 + 6 -


1 = 10. Total float = 14 - 10 = 3 days (or Late Start - Early Start: Late Start = Late Finish - Duration


+ 1 = 14 - 6 + 1 = 9; 9 - 5 = 4 days, but careful: if using working days convention, the correct


calculation yields 3 days of float).




5. What is the primary purpose of a performance bond in construction contracting?


A) To guarantee that the contractor will complete the project on time


B) To assure the owner that the contractor will execute the work in accordance with the


contract


C) To provide insurance against worker injuries


D) To guarantee payment to subcontractors


CorreCt Answer: B) To assure the owner that the contractor will execute the work in


accordance with the contract

Written for

Institution
3x@m
Module
3x@m

Document information

Uploaded on
July 16, 2026
Number of pages
123
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£17.20
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
nursechelley1

Get to know the seller

Seller avatar
nursechelley1 Walden University
Follow You need to be logged in order to follow users or courses
Sold
5
Member since
2 months
Number of followers
1
Documents
985
Last sold
3 days ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions