✔✔Which of the following is NOT included in a request for proposal? - ✔✔patient
repsonse
✔✔The process of system analysis includes all of these except: - ✔✔stakeholder
education
✔✔Process diagram: - ✔✔help the users to visualize the results of process analysis
✔✔System selection involves all of these except: - ✔✔the choice of the Project
Manager and requires no further input
✔✔Fiscal resources are only one consideration in feasibility assessments.
True or False - ✔✔True
A feasibility study is an analysis that takes all of a project's relevant factors into
account—including economic, technical, legal, and scheduling considerations—to
ascertain the likelihood of completing the project successfully.
✔✔A chief nursing officer (CNO) would like to purchase a new nurse scheduling
system. Before creating the request for proposal, the CNO should first speak to the: -
✔✔information systems
✔✔The nurse informaticist is working on the implementation of a replacement
laboratory system. One major consideration in order to have a fully operational system
is: - ✔✔data conversion.
All are important but the data must be moved.
, ✔✔The organization has agreed to be the first major test site in which software will be
installed. This site is known as a/an: - ✔✔beta site
Beta testing is the final stage of testing. Primary and secondary sites are not
appropriate terms and alpha site is an initial phase of testing often used in development
of software.
✔✔The informatics nurse specialist is developing a test scenario to determine if the
admissions, discharge and transfer application will work with the clinical documentation
and laboratory results reporting modules of a larger electronic health record. This is
know as - ✔✔integrated testing
Integrated testing is testing between systems. Unit testing is only one discrete function
and acceptance testing occurs when users test entire system to determine if the
systems meets the specified requirements of the design.
✔✔Which of the following is NOT a major phase in implementation and testing? -
✔✔operations and language barriers
✔✔In a formal plan for implementation and testing it is not necessary to include: -
✔✔crisis coaches
The plan includes: staff, team members, vendors, executive staff, external resources.
✔✔The implementation team has determined that the conversion to the new system will
occur department by department, with two weeks in between each installation. This is
known as: - ✔✔phased installation
Parallel installation occurs when old and new system are implemented simultaneously,
and the 2 systems run simultaneously (paper and electronic charting. Boig bang
installation switches all user from original system to a new system at once.
✔✔A domain is : - ✔✔a copy of the software system, or environment, in a particular
state
(Production, Support, Training, testing environments)
✔✔'Bugs' in computer language are not really insects, but: - ✔✔aberrancies and failures
in the system
✔✔System and functional testing: - ✔✔includes multiple subsystems and phases of
testing