Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Operations Management Chapter 8 Questions With Complete Solutions

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
02-03-2026
Written in
2025/2026

Operations Management Chapter 8 Questions With Complete Solutions

Institution
Operations Management
Module
Operations Management

Content preview

Operations Management Chapter 8 Questions With Complete Solutions


An orthopedic surgeon has read an article about the Toyota Production System and now wants to
organize her surgery operation based on lean principles. To eliminate all idle time in the operating room,
she decides to call in patients six hours before the scheduled surgery time. Is this a lean process? -
(ANSWER)No: The surgeon emphasizes the reduction of the waste of the resources (doctor and
operating room). However, she does this at the expense of the patient who now wastes six hours of the
flow time waiting.



Pulling the andon cord can cause a loss of output. In TPS, an employee should pull the Andon cord: -
(ANSWER)Whenever a problem occurs



What is the roof in the "house-shaped" representation of the Toyota Production System? -
(ANSWER)Waste-reduction: The roof is the reduction of waste by better matching supply with demand.



A single inspection system with experts testing the output of the process will help reduce the
information turnaround time. - (ANSWER)False: For a short information turnaround time, many
inspection points throughout the process are needed.



Which of the following does not belong to seven sources of waste? - (ANSWER)Overtime: Overtime is
not part of the seven sources of waste



What happens to the number of Kanban cards in the process if the replenishment time goes up? -
(ANSWER)The number of kanban cards increases



If takt time increases, the operation requires: - (ANSWER)fewer workers



What is the relationship between the number of kanban cards in a process and the inventory level? -
(ANSWER)There never can be more inventory in the process than what was authorized via Kanban cards.



Kaizen favors automation and investment in technology. - (ANSWER)False: Kaizen favors continuous
improvements driven by the employees.



Which of the following objectives is more important in a pull system? - (ANSWER)Producing at the rate
of demand

Written for

Institution
Operations Management
Module
Operations Management

Document information

Uploaded on
March 2, 2026
Number of pages
3
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

£10.42
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
SmarterCrest

Get to know the seller

Seller avatar
SmarterCrest Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1319
Member since
2 months
Number of followers
0
Documents
602
Last sold
4 weeks ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Trending documents

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions