1. What is the minimum required slope for roof drainage on a low-
slope roof?
A. 1/8 inch per foot
B. 1/4 inch per foot
C. 3/8 inch per foot
D. 1/2 inch per foot
The code minimum for positive roof drainage is 1/4 in. per foot.
2. Which document best defines the scope of work between owner
and contractor?
A. General conditions
B. Addenda
C. Contract agreement
D. Schedules
The contract agreement outlines deliverables and scope.
3. What is the primary purpose of a performance bond?
A. Guarantee payment to subcontractors
B. Cover worker injury
-2026 North Carolina Intermediate
North Carolina
Contractor
Intermediate
Exam –Questions
Contractor Exam
And Correct
–Questions
Answers
And(Verified
CorrectAnswers)
Answers Plus
(Verified
Rationales
Answers) Plus Rationales
,Page 2 North Carolina Intermediate
North Carolina
Contractor
Intermediate
ExamContractor
–Questions
ExamAnd
–Questions
Correct Answers
And Correct
(Verified
Answers
Answers)
(Verified
Plus Rationales
Answers) Plus Rationales.pdf
C. Ensure contractor completes the project per contract
D. Provide insurance against defective materials
A performance bond protects the owner by guaranteeing completion.
4. Which entity issues North Carolina contractor licenses?
A. Department of Labor
B. Department of Insurance
C. NC Licensing Board for General Contractors
D. State Building Code Council
The NCLBGC oversees contractor licensing.
5. The Intermediate license in NC allows a contractor to work on
projects up to:
A. $250,000
B. $1,000,000
C. $750,000
D. Unlimited
The Intermediate classification limit is $1 million per project.
6. Which schedule shows when specific tasks must start and finish?
A. Cost schedule
B. Procurement schedule
C. Project timeline schedule
D. Budget schedule
The timeline or project schedule maps durations and task sequencing.
7. What is retainage?
A. Insurance cost
B. A tax deduction
-2026 North Carolina Intermediate
North Carolina
Contractor
Intermediate
Exam –Questions
Contractor Exam
And Correct
–Questions
Answers
And(Verified
CorrectAnswers)
Answers Plus
(Verified
Rationales
Answers) Plus Rationales
, Page 3 North Carolina Intermediate
North Carolina
Contractor
Intermediate
ExamContractor
–Questions
ExamAnd
–Questions
Correct Answers
And Correct
(Verified
Answers
Answers)
(Verified
Plus Rationales
Answers) Plus Rationales.pdf
C. Withheld portion of payment until work is complete
D. Added contingency
Retainage protects the owner until final completion.
8. When is a building permit typically required?
A. Minor cosmetic changes
B. Structural or system modifications
C. Painting work only
D. Furniture installation
Significant changes require permitting.
9. What is the purpose of a punch list?
A. Track employee hours
B. Material delivery checking
C. List of incomplete or deficient items before final payment
D. Proposal summary
Punch lists document final required corrections.
10. Which soil type has the poorest bearing capacity?
A. Gravel
B. Sand
C. Clay
D. Crushed stone
Clays are compressible and have lower strength.
(Continuing…)
11. A change order must include:
-2026 North Carolina Intermediate
North Carolina
Contractor
Intermediate
Exam –Questions
Contractor Exam
And Correct
–Questions
Answers
And(Verified
CorrectAnswers)
Answers Plus
(Verified
Rationales
Answers) Plus Rationales